My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> ' CONDITIONS OF THE CONTRACT <br /> 00800-SUPPLEMENTARY <br /> CONDITIONS <br /> submit an itemized list of quantities with the applicable unit costs and extended <br /> price for each, in such form and detail as required by the Construction Manager/ <br /> Architect. <br /> ' 1 As a minimum the detailed breakdown shall include and indicate the items <br /> enumerated below. Items (a) and (b) constitute the cost of labor, and items <br /> (a), (b), (c) and (d) constitute the basic costs referred to under this Article 7. <br /> ' (a) Labor costs, itemized by each trade involved, showing the hourly rates <br /> for each, and the hours required for the change. Labor rates shall be <br /> ' the same for extra and credit computations and shall be the actual rate <br /> paid workmen in accordance with established management labor <br /> agreement. <br /> (b) Burden on labor, which shall be only the actual costs of mandatory <br /> fringe benefits required by established agreements, taxes on labor, <br /> ' worker's or workmen's compensation, insurance on labor as affected by <br /> payroll, unemployment taxes and insurance, including FICA and <br /> FUTA. <br /> (c) Quantities of materials, equipment and supplies, at their actual cost, <br /> with unit costs indicated. <br /> ' (d) The cost of subcontracted work, computed in the same way as <br /> provided for under this Subparagraph 7.1.5. <br /> (e) Overhead,profit or commission. <br /> (f) Applicable sales tax on materials, added after the above computations <br /> are complete. <br /> .2 The maximum that will be allowed for overhead and profit, or commission, <br /> shall be as,follows,.expressed as a percentage of the basic cost of the change. <br /> The maximum allowable percentages for profit, overhead and commission <br /> may be less, depending on the nature, extent or complexity of the change, <br /> where the percentage is not commensurate with the responsibility and <br /> administration involved (such as the Contractor merely processing a <br /> ' substantial Change Order to a Subcontractor) but in no event shall they <br /> exceed the following: <br /> 1 <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800- 11 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.