My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> CONDITIONS OF THE CONTRACT , <br /> 00800-SUPPLEMENTARY <br /> CONDITIONS <br /> 5.2 Award of Subcontracts and Other Contracts for Portions of the Work <br /> 5.2.1 At the end of the first sentence, add: -- along with a list of the actual materials ' <br /> or equipment they will be furnishing. <br /> 5.2.3 Add to Subparagraph: No increase in the Contract Sum shall be allowed should <br /> a substitution be required as a result of the Owner's or Architect's reasonable <br /> objection based on specified criteria on which a proposed subcontractor will be , <br /> evaluated. <br /> 6. ARTICLE 6 - CONSTRUCTION BY OWNER OR BY OTHER , <br /> CONTRACTORS <br /> 6.2 Mutual Responsibility <br /> 6.2.1 Change Subparagraph to read: The Contractor and Subcontractors shall <br /> cooperate with and coordinate their work with all other contractors and the , <br /> Owner to facilitate the general progress of the Project and to prevent delaying <br /> the progress of other contractors. The Contractor shall afford other contractors <br /> reasonable opportunity for the introduction and storage of their materials and <br /> equipment and the execution of their work, and shall connect and coordinate <br /> contractor's Work with theirs as required by the Contract Documents. Each <br /> contractor and subcontractor shall obtain layout drawings, roughing-in detail ' <br /> sheets and other pertinent information directly from each other (not from <br /> Architect nor Construction Manager) to coordinate all phases of the Work. For <br /> coordination with the Owner's equipment or materials, information shall be <br /> obtained from the Owner through the Construction Manager. After timely <br /> notification by the Contractor of the need to accomplish a particular phase or <br /> element of the Work, the other contractors shall, within a reasonable time, ' <br /> perform their work so as not to delay or impede the Contractor. <br /> 6.2.3 Between the words "construction" and "shall", insert: --, or lack of coordination ' <br /> with.other contractors„-- <br /> 6.2.4 In the first line, delete the word "wrongfully". ' <br /> 7. ARTICLE 7 - CHANGES IN THE WORK <br /> 7.1 Changes <br /> 7.1.5 Add Subparagraph: For proposed changes in the Work on the lump sum or time , <br /> and material methods under Clauses 7.3.1.1 and 7.3.3.4 above, the costs shall be <br /> determined as provided under this Subparagraph 7.1.5. The Contractor shall <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800- 10 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.