My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> CONDITIONS OF THE CONTRACT <br /> 00800-SUPPLEMENTARY <br /> CONDITIONS <br /> 3.4.5 Add Subparagraph: After the Contract has been executed, the Owner and the <br /> Architect, after consultation with the Construction Manager, will consider a <br /> formal request for the substitution of products in place of those specified only <br /> under the conditions set forth in the General Requirements (Division 1 of the <br /> Specifications). , <br /> 3.4.6 Add Subparagraph: By making requests for substitutions based on the <br /> preceding subparagraph,the Contractor: , <br /> 1 Represents that the Contractor has personally investigated the proposed <br /> substitute product and determined that it is equal or superior in all respects , <br /> to that specified; <br /> .2 Represents that the Contractor will provide the same warranty for the <br /> substitution that the Contractor would for that specified; <br /> .3 Certifies that the cost data presented is complete and includes all related <br /> costs under this Contract except the Architect's redesign costs, and waives <br /> all claims for additional costs related to the substitution which subsequently <br /> become apparent; and <br /> .4 Will coordinate the installation of the accepted substitute, making such <br /> changes as may be required for the work to be complete in all respects. <br /> 3.5 Warranty <br /> 3.5.1 In the ninth line after the word "defective" add the words "the Contractor's <br /> warranty excludes remedy for damage or defects caused by abuse, modifications <br /> not executed by the contractor, or those under its jurisdiction, improper or , <br /> insufficient maintenance, improper operation or normal wear and tear under <br /> normal usage." Add to Subparagraph: The quality required under this Warranty <br /> shall, as a minimum, equal all standards or requirements of form, function, <br /> durability, performance, type, strength, efficiency, service, .appearance or other <br /> criteria established by the requirements of the Contract Documents. <br /> 3.7 Permits,Fees, and Notices <br /> 3.7.1 Add to Subparagraph: The Contractor shall provide and pay for all bonds that <br /> may be required to accomplish the Work, including any bonds required by <br /> municipalities. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800-4 ' <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.