DIVISION 0 <br /> CONDITIONS OF THE CONTRACT <br /> 00800-SUPPLEMENTARY <br /> CONDITIONS <br /> a seven day period after receipt of written notice from the Owner to the <br /> Contractor and Surety, if any, written notice from the Owner to the Contractor <br /> and Surety, if any, to commence and continue correction of such default or <br /> neglect with diligence and promptness, the Owner may after such seven day <br /> ' period give the Contractor and Surety a second notice to correct such <br /> deficiencies within a second seven day period and may require the Surety to <br /> assume the obligations of the Contractor within seven days following receipt by <br /> the Contractor and Surety of this second seven day period after receipt of such <br /> second notice fails to commence and continue to correct such default or neglect, <br /> the Owner may without prejudice to any other remedies the Owner may have, <br /> ' correct such deficiencies. In such case, an appropriate Change Order shall be <br /> issued deducting from the payments then or thereafter due the Contractor, or <br /> Surety, the cost of correcting such deficiencies, including compensation for the <br /> ' Architect's and Construction Manager's additional services made necessary by <br /> such default, neglect or failure. Such action by the Owner and amounts charged <br /> to the Contractor are both subject to the prior concurrence of the Architect after <br /> consultation with the Construction Manager. If payments then or thereafter due <br /> the Contractor are not sufficient to cover such amounts, the Contractor, or <br /> Surety, shall pay the difference to the Owner. <br /> ' 3. ARTICLE 3 -CONTRACTOR <br /> 3.4 Labor and Materials <br /> 3.4.2 Add to Subparagraph: All work shall be performed in the best and most <br /> workmanlike manner to the highest standards for the work. Incompetent or <br /> careless workmanship shall not be permitted by the Contractor and will not be <br /> accepted. <br /> ' 3.4.3 Add Subparagraph: The Contractor, and all those working under its jurisdiction, <br /> shall conform to labor laws of the state and all other laws, ordinances and legal <br /> ' requirements affecting the Work. Prior to starting work, the Contractor shall <br /> become,familiar with local.labor and trade.conditions,,skilled and unskilled,,and <br /> shall conform to local conditions. The Contractor shall consider the availability <br /> of labor in the area and import labor as may be required to meet the schedule for <br /> the Work. <br /> 3.4.4 Add Subparagraph: Unless otherwise provided in Contract Documents, all <br /> materials, equipment and other products shall be one of the brands, <br /> manufacturers or types specified. All like products for the Work shall be by the <br /> same manufacturer. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800- 3 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />