My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> CONDMONS OF THE CONTRACT ' <br /> 00800-SUPPLEMENTARY <br /> CONDITIONS <br /> 1.2.6 Add Subparagraph: The general character and scope of the Work is called for <br /> by the Contract Documents. Where a portion of the Work is fully drawn and the <br /> remainder is merely indicated, the portion fully drawn shall apply to all similar <br /> parts of the Work. Drawings intended primarily as information for one trade <br /> may not necessarily show the work of other trades, which shall not be construed <br /> as there being no related materials or adjacent work. <br /> 1.2.7 Add Subparagraph: Figured dimensions shall be followed in preference to <br /> measurement by scale. In the event of discrepancies between Drawings, <br /> between Drawings and Specifications or between Specifications, the intent shall <br /> be interpreted by the Architect, which shall be binding on the Contractor. <br /> Where a dimension may be missing, the Work shall be accomplished in <br /> accordance with the directions and dimensions provided by the Architect. <br /> Dimensions on Drawings, as well as detail Drawings themselves, are subject in <br /> every case to measurements of existing, adjacent, incorporated and completed <br /> work which shall be taken by the Contractor before undertaking any work <br /> dependent upon such data. Dimensions pertaining to the Work shall be verified <br /> at site by Contractor. <br /> 1.2.8 Add Subparagraph: Where Specifications are of the abbreviated or <br /> "streamlined" type, they shall be construed as complete sentences, as shall notes <br /> on the drawings. Omission of words such as "the", "the Contractor shall", and <br /> "as shown on the drawings" is intentional. The words "shall" or "shall be" are to ' <br /> be supplied by inference. Imperative or directive instruction, directions or <br /> specifications apply and refer to the Contractor. The words "symmetrical" and <br /> "similar" are used in the general sense and need not mean "identical". <br /> 1.2.9 Add Subparagraph: Where a number is specified (as for gauges, weights, <br /> temperatures, an amount of time, and similar references) and the specified <br /> number cannot be obtained, the number shall be interpreted as the next better, as <br /> available. <br /> 2. ARTICLE 2- OWNER <br /> 2.2 Information and Services Required of the Owner <br /> 2.2.2 Add to Subparagraph by inserting at the beginning: Except as otherwise <br /> required by the Contract Documents, -- <br /> 2.4 Owner's Right to Carry Out the Work <br /> 2.4.1 Delete Subparagraph, insert instead: If the Contractor defaults or neglects to <br /> carry out the Work in accordance with the Contract Documents and fails within <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800-2 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.