My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> ' CONDITIONS OF THE CONTRACT <br /> 00800-SUPPLEMENTARY <br /> CONDITIONS <br /> GENERAL <br /> A. The following supplements modify, change, delete from or add to the "General <br /> Conditions of the Contract for Construction," AIA Document A201/CMa <br /> Construction Management, edition 1992. Where any article of the General <br /> Conditions is modified or any paragraph, subparagraph or clause thereof or <br /> deleted by these Supplementary Conditions, the unaltered provisions of the <br /> Article,Paragraph, Subparagraph or Clause shall remain in effect. <br /> 1. ARTICLE 1 -GENERAL PROVISIONS <br /> ' 1.1 Basic Definitions <br /> 1.1.1 The Contract Documents: Add as part of Contract Documents: Performance <br /> Bond or Performance-Labor Material Bond, is required; Contractor's Bid. <br /> 1.2 Execution, Correlation, and Intent <br /> 1.2.2 Add at the end: --; however, Contractor does not represent having examined <br /> conditions that are not exposed without demolition unless the necessary <br /> demolition is specified or authorized. The Contractor also represents that all <br /> Contract Documents for the Project have been examined, including those <br /> intended for work of trades not normally performed by the Contractor's own <br /> forces, and has become thoroughly familiar with all conditions which may <br /> pertain to or affect the Work under this Contract. <br /> 1.2.3 Add at the end of first sentence: --; in proper operating condition. <br /> ' 1.2.4 At the end of the last sentence, add the following: --,unless it is specified that a <br /> subcontract include specific phases or elements to complete a certain part of the <br /> Work for reasons of coordination or responsibility. Where the Specification has <br /> been divided into sections, it is for convenience in use. The Architect assumes <br /> no responsibility for proper placement of phases.of the.Work. intothe proper. <br /> division or section nor the arrangement of Work shown on the Drawings. The <br /> Architect shall not be obligated to enter into jurisdictional or other disputes as a <br /> result of the organization, arrangement or location of parts of the Work in <br /> Specifications or on Drawings, nor to serve as arbiter to establish subcontract <br /> limits. Unless otherwise specified, the scope of work of each section shall be to <br /> furnish labor, materials, equipment, skill, erection, installation, services and <br /> related items for the phase of work of that section, as required by the Drawings, <br /> as specified or as otherwise required to provide and complete the entire work of <br /> the section. <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00800- 1 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.