My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Ply felts: 3 plies coated ply sheet. <br /> 4. Interply bitumen: Coal Tar Pitch,ASTM D 450-78,type as required by slope. <br /> 5. Deck primer at concrete deck. <br /> 6. Tape: Fiberglass roof tape. <br /> 7. Temperature limitations: <br /> a. Maximum 400°F. <br /> b. Minimum 300°F. <br /> C. Recommended 375°F. (350°F max.in kettle storage) <br /> 8. Envelopes as required. <br /> 9. Follow precautions contained in NIOSH Publication DREW 78-107. <br /> C. Aggregate: Clean,smooth river gravel,ASTM D 1863. <br /> D. Insulation: Rigid glass fiber boards with integrally bonded top covering of saturated felt or Kraft paper. <br /> E. Walkway protection boards(if required): Mineral surfaced bituminous composition boards;Carey-Tread by r <br /> Celotex Corp.or approved equal. <br /> PART 3: EXECUTION <br /> 3.01 INSTALLATION <br /> A. Inspect substrate and report unsatisfactory conditions in writing. Beginning work means acceptance of substrate. <br /> Coordinate installation with other trades,including carpentry,flashing and penetrating work. <br /> B. Comply with NRCA Roofing and Waterproofing Manual and manufacturer's installation instructions. <br /> C. Clean,prime and prepare substrate. <br /> D. Install insulation in one layer with tightly butted joints and neatly fitted around penetrations. <br /> E. Install walkway protection membrane at locations indicated and where required to provide access to roof mounted <br /> equipment. <br /> F. Restore or replace damaged components. Protect work from damage. <br /> END OF SECTION 07520 <br /> r <br /> r <br /> r <br /> 07520-2 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.