My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 07520 <br /> BUILT-UP ROOFING <br /> 1 PART 1: GENERAL <br /> 1.01 RELATED DOCUMENTS <br /> A. All of the Contract Documents, including General and Supplementary Conditions, and Division 1 General <br /> ' Requirements,apply to the work of this section. <br /> 1.02 SUMMARY <br /> A. Scope of work includes cutting in and patching of vents,curbs,drains and/or any other miscellaneous work <br /> identified on Architectural,Mechanical or Electrical plans. <br /> B. Provide either asphalt bitumen or cold tar type built-up roofing system,including insulation. Contractor responsible <br /> to determine suitable system to be compatible with existing roofing system. <br /> 1.03 SUBMITTALS <br /> A. Submit roofing contractors letter certifying roof has been inspected and composition of existing roof determined. <br /> B. Submit for approval samples,product data,warranty,test reports,maintenance data. <br /> 1.04 QUALITY ASSURANCE <br /> A. Comply with governing codes and regulations. Provide products of acceptable manufacturers which have been in <br /> satisfactory use in similar service for three years. Use experienced installers. Deliver,handle and store materials in <br /> accordance with manufacturer's instructions. <br /> B. FM Class I,UL Class A,Class 90 wind uplift. <br /> 1.05 WARRANTY <br /> A. Manufacturer's standard signed warranty indicating extent of warranty coverage. Warranty period is 10 years from <br /> date of Substantial Completion. <br /> PART 2: PRODUCTS <br /> 2.01 MATERIALS <br /> A. Asphalt system;Johns Manville,Firestone,Tampko.,GAF or approved equal: <br /> 1. Slip sheet: 5 lb.rosin-sized paper if recommended by manufacturer. <br /> 2. Base ply: 281b.glass fiber base sheet. <br /> 3. Ply felts: 2 plies of Type 4 asphalt glass fiber felts. <br /> 4. Interply bitumen: Roofing asphalt,ASTM D 312,type as required by slope. <br /> 5. Deck primer at concrete deck. <br /> 1 B. Coal-Tar System;Koppers,Allied Signal or approved equal. <br /> 1. Slip sheet: 5 lb.rosin-sized paper if recommend by manufacturer. <br /> 2. Base ply: 1 ply coated base sheet. <br /> 07520-1 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.