My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Insulation Adhesive: Compatible adhesive recommended by insulation manufacturer to secure insulation to <br /> substrate. <br /> E. Fasteners: Corrosion-resistant fasteners as required to secure insulation to substrate. <br /> PART 3: EXECUTION <br /> 3.01 INSTALLATION <br /> A. Insu17 <br /> 1. Install snugly between framing members flush with inside face of framing. Correct any voids or depressions. <br /> 2. Cut to fit tightly around wall penetrations, blocking, bridging, electrical boxes and conduit, etc. Insure <br /> minimum 1/2 full insulation depth behind or around all items. <br /> 3. Stuff loose insulation around door and window frames and other voids and penetrations. Do not allow any <br /> voids or gaps in the insulation envelope. <br /> C. Vapor Barrier <br /> 1. Install vapor barrier over inside face of framing at Insulation Type 7. Secure to framing with minimum <br /> penetrations. <br /> 2. Provide sufficient material at perimeter to lap over openings,framing,penetrations. <br /> 3. Lap and seal at all joints,penetrations and to adjacent surfaces and materials with specified tape. <br /> 3.02 CLEANING AND PROTECTION <br /> A. Protect insulation from damage until covering materials are installed. <br /> B. Remove accumulations of waste materials,excess insulation and containers and dispose of off site. <br /> END OF SECTION 07210 <br /> 07210-2 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.