My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 07210 <br /> BUILDING INSULATION <br /> PART 1: GENERAL <br /> 1.01 APPLICABLE DOCUMENTS <br /> A. Bidding Requirements, Conditions of the Contract and pertinent portions of Sections in Division One of these <br /> Specifications apply to the Work of this Section. <br /> 1.02 SUMMARY <br /> A. Section includes: <br /> 1. Insulation type 7-Batt and loose insulation. <br /> B. Related work specified in other sections: <br /> 1. Insulation type 1 -Division 7,Section"Roofing". <br /> 2. Insulation type 3-Section 04150. <br /> 3. Insulation type 5-Section 03300. <br /> 4. Insulation type 6-Section 08521. <br /> 5. Insulation type 8-Section 09250. <br /> 6. Insulation type 9-Section 07250. <br /> 1.03 PRODUCT DELIVERY,STORAGE AND HANDLING <br /> A. Deliver material to the site in unopened packages,with identification labels intact. <br /> B. Store under water resistant cover and protect from weather and direct sunlight. <br /> C. Remove damaged materials from site. <br /> 1.04 ENVIRONMENTAL REQUIREMENTS <br /> A. Do not install rigid insulation when temperature is below 40o F., during rain or wet weather, or when surfaces are <br /> wet. <br /> 1.05 SCHEDULING <br /> A. Coordinate installation with other trades whose work may be affected or have effect. <br /> PART 2: PRODUCTS <br /> 2.01 MATERIALS <br /> A. Insul 7: Unfaced glass fiber batts conforming to Federal Specification HH-I-521E,Type 1. CertainTeed,Manville, <br /> Owens Corning acceptable. <br /> B. Vapor Barrier: Glass reinforced or laminated polyethylene sheet, minimum perm rating 0.1 when tested in <br /> accordance with ASTM-E96,Procedure A. Fortifiber"Moistop",Rufco SS-300,Glas-Krafat,Inc.acceptable. <br /> C. Vapor Barrier Tape: Compatible polyethylene self adhesive tape recommended by vapor barrier manufacturer. <br /> 07210-1 No.99132-CP2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.