Laserfiche WebLink
PART 3: EXECUTION <br /> 3.01 COORDINATION <br /> A. Coordinate work of this Section with related work of other sections as necessary to obtain proper installation of all <br /> items. <br /> B. Verify site dimensions of cabinet locations in building prior to fabrication. <br /> 3.02 INSTALLATION <br /> A. Storage and Protection: Casework shall be protected in transit. Store under cover in a ventilated building not <br /> exposed to extreme temperature and humidity changes. Do not store or install casework in building until concrete, <br /> masonry and plaster work is dry. <br /> B. Workmen: Install casework under the supervision of the manufacturer's representative with factory-trained <br /> mechanics authorized by manufacturer. <br /> C. Workmanship <br /> 1. Erect casework straight,level and plumb and securely anchor in place. Scribe and closely fit to adjacent work. <br /> Cut and fit work around pipes,ducts,etc. <br /> 2. Install all items complete and adjust all moving parts to operate smoothly. <br /> 3. Leave surface clean and free from defects at time of final acceptance. <br /> D. Clean-up: Remove all cartons, debris, sawdust, scraps, etc. and leave spaces clean and all casework ready for <br /> Owner's use. <br /> END OF SECTION 06401 <br /> 06401-7 No.99132-CP2 <br />