|
DIVISION 0
<br /> PROJECT IDENTIFICATION
<br /> 00100-INSTRUCTIONS TO BIDDERS
<br /> satisfactorily perform work under the Contract, as specified under Article 5.2 of
<br /> General Conditions and Supplementary Conditions and in Section 01300.
<br /> 19. COMPLETION TIME: Commencement of Work and time of completion shall be
<br /> essential condition of the Contract. Work shall be completed within time specified,
<br /> agreed upon and entered into Contract. Refer to Section 01010 for dates and further
<br /> requirements of completion.
<br /> 20. PRE-BID EVALUATION - PROCEDURE FOR PROPOSED SUBSTITUTED
<br /> MATERIALS & EQUIPMENT: The word "product" herein means any material,
<br /> equipment, assembly, manufacturer, brand, trade name, element, item or similar
<br /> description as applicable. Wherever a product is named on the drawings or in the
<br /> specifications, the phrase "or acceptable substitute in the opinion of the Architect"
<br /> shall be implied throughout, whether specifically noted or not.
<br /> All requests for consideration of proposed substitute products for those specified shall
<br /> be made in writing and must be received by Architect at least ten (10) days prior to
<br /> bid date and bid hour. Acceptable substitute products will be included in addenda. '
<br /> Requests received after this time will not be considered or reviewed. Requests shall
<br /> clearly define and describe product for which acceptance is requested, and shall be
<br /> accompanied by manufacturer's literature, specifications, drawings, cuts, performance
<br /> data, list of references, model numbers, or other information necessary to completely
<br /> describe the item.
<br /> Acceptance of a product by the Architect for bidding purposes will be in the form of
<br /> addenda to Contract Documents, issued as specified. No information or indication of
<br /> acceptance will be provided in any other manner than addendum.
<br /> The use of references to standards, manufacturers, brands and similar designations is
<br /> intended to establish the measure of quality as to minimum standards of design,
<br /> function, appearance, type, strength, durability, construction, efficiency, sound level,
<br /> finish, appearance, availability, service and similar characteristics, which have been
<br /> determined as requisite for this Project. Proposed alternate products shall also be
<br /> available in the same range of colors,textures, dimensions, gauges, types,and finishes
<br /> as the material or article specified; must equal the specified item in strength,
<br /> durability, efficiency, serviceability, ease and cost of maintenance; must be
<br /> compatible with the building design and not necessitate design modifications; nor
<br /> impose additional work or require changes in the work of any Prime Contractor, or
<br /> any other Subcontractor, vendor, or materials supplier, nor result in any additional
<br /> cost to the Owner. The supplier or manufacturer providing any acceptable product
<br /> shall bear the cost of any required modifications to spaces, services, utilities and other
<br /> features as the result of the use of his product, including but not limited to larger
<br /> capacity mechanical or electrical service, devices or utilities resulting from acceptance
<br /> of the product for bidding purposes, as well as to pipes, conduits, ducts, and controls
<br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00100-6
<br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL
<br />
|