My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction project manual-2000/Media center
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0685 Old Crystal Bay Road North - 33-118-23-21-0002
>
Misc
>
Construction project manual-2000/Media center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:48:02 PM
Creation date
2/22/2018 1:41:15 PM
Metadata
Fields
Template:
x Address Old
House Number
685
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
685 Old Crystal Bay Road North
Document Type
Misc
PIN
3311823210002
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 0 <br /> PROJECT IDENTIFICATION <br /> 00100-INSTRUCTIONS TO BIDDERS <br /> sixty(60) days after the date of the opening of bids, upon demand of the bidder at any <br /> time thereafter, so long as he has not been notified of the acceptance of his bid. <br /> Bid security shall be forfeited to Owner as liquidated damages in the event bidder is <br /> awarded a Contract and he fails or refuses to execute the Agreement and furnish <br /> specified bond within ten (10) days after award, provided Agreement is ready for <br /> signature. If Agreement has not been prepared within ten (10) days, Contractor shall <br /> have two (2)days after its preparation for execution. <br /> ' 14. WITHDRAWAL OF BIDS: A bidder may withdraw his bid at any time prior to date <br /> set for receiving bids (or authorized postponement thereof). Thereafter, the bids may <br /> be withdrawn only after sixty (60) days has elapsed after bid date, provided Owner <br /> has not acted thereon. <br /> 15. QUALIFICATIONS OF BIDDERS: Owner may make such investigations as he <br /> deems necessary to determine the ability and responsibility of the bidder to perform <br /> the work, and any bidder shall furnish to Owner all such information and data for this <br /> ' purpose, as the Owner may request. Owner reserves the right to reject any bid if the <br /> evidence submitted by, or investigation of, such bidder fails to satisfy the Owner that <br /> such bidder is properly qualified to carry out the obligations of the contract and to <br /> 1 complete the Work contemplated therein. The competence and responsibility of <br /> bidder will be considered in making an award, including,but not limited to: (1) proof <br /> of financial responsibility, (2) quality of similar work, (3) amount of experience with <br /> similar projects, (4) facilities, personnel and equipment, (5) reputation for <br /> performance, and (6) ability to complete the work within specified time. Owner <br /> reserves the right to reject any Bid where there is reasonable doubt as to the <br /> qualifications of the bidder. <br /> 16. ACCEPTANCE OF BID - AWARD OF CONTRACT: Owner reserves the right to <br /> (1) accept bidder's Base Bid only, (2) accept any one or more of bidder's Alternate <br /> Bids, in any order regardless of the order in which they were listed, (3) reject all Bids, <br /> (4) award contract based on his investigation of bidders, as well as acceptance of <br /> alternates, including the bond alternate, all of which Owner deems to be in his best <br /> interest, (5), waive informalities or... minor irregularities in bids and waive minor <br /> irregularities or discrepancies in bidding procedure. <br /> 17. PERFORMANCE BOND: Upon award oContract, Contractor shall provide <br /> Material and Labor Performance Bond in the amount of 100% of Contract Sum in <br /> accordance with General Conditions and Amendments to General Conditions. <br /> 18. SUBCONTRACTS - SUPPLIERS: Proposed subcontractors are subject to Owner's, <br /> Construction Manager's and Architect's acceptance. The right of rejection may be <br /> exercised when there is reasonable doubt the subcontractor (supplier) will be able to <br /> EXISTING ORONO MIDDLE SCHOOL-NEW MEDIA CENTER SECTION 00100-5 <br /> BID PACKAGE 1: GENERAL CONSTRUCTION,MECHANICAL&ELECTRICAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.