My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00492 - ROW permit
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
701 Dickey Lake Drive - 34-118-23-22-0005
>
Permits/Inspections
>
2017-00492 - ROW permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:04 PM
Creation date
1/19/2018 12:19:50 PM
Metadata
Fields
Template:
x Address Old
House Number
701
Street Name
Dickey Lake
Street Type
Drive
Address
701 Dickey Lake Drive
Document Type
Permits/Inspections
PIN
3411823220005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
38. WATER AND ELECTRICITY <br /> 38.1 The CONTRACTOR shall make arrangements with the proper government officials <br /> and/or private parties for obtaining any water or electric power which may be needed. <br /> 39. SANITARY PROVISIONS <br /> 39.1 The CONTRACTOR shall comply with all laws,rules and regulations of the State and <br /> Local Health Authorities and shall take the necessary precautions to avoid unsanitary <br /> conditions. <br /> 39.2 Suitable sanitary conveniences for the use of all persons employed on the WORK, <br /> properly screened from public observation,shall be provided and maintained by the <br /> CONTRACTOR. <br /> 40. FOSSILS <br /> 40.1 If any fossils or treasure or other unusual or valuable geological formations are found in <br /> the progress of excavating,such fossils,treasure or samples of geological formations <br /> shall be carefully preserved by the CONTRACTOR who shall convey such items to a <br /> State or Federal Agency concerned with their preservation and study. These items shall <br /> become the property of said State or Federal Agency. <br /> 41. CONSTRUCTION OBSERVATION <br /> 41.1 The CONTRACTOR shall not begin the construction of any part of this improvement <br /> until he shall have notified the ENGINEER in writing of his intention to do so,stating the <br /> time when WORK is to commence. Such notice shall be at least forty-eight(48)hours <br /> prior to the time when actual WORK is to commence. In the event the CONTRACTOR <br /> temporarily leaves a job for more than two consecutive working days he shall submit <br /> such notice upon his return to WORK. The CONTRACTOR shall keep the ENGINEER <br /> advised as to WORK schedule. Any WORK performed at times of places outside of the <br /> established WORK schedule shall be regarded as contrary to and outside of the terms of <br /> this CONTRACT and the ENGINEER of his authorized representative may order such <br /> WORK torn out of removed and replaces without obligation on the part of the OWNER <br /> to pay for the same. <br /> 41.2 No material of any kind shall be used on any part of this improvement until it has been <br /> inspected and approved by the ENGINEER. All rejected MATERIALS shall be removed <br /> from the line of this improvement by the CONTRACTOR within two working days after <br /> its rejection. <br /> 41.3 Failure to condemn any inferior material or WORK at the time of its use on construction <br /> shall not be construed as an acceptance of the same,but the CONTRACTOR shall upon <br /> notice from the ENGINEER at any time prior to the final acceptance of the improvement <br /> immediately tear out,remove and properly reconstruct,at his own cost,any portion of <br /> this improvement which the ENGINEER may decide to be defective and the <br /> CONTRACTOR will be held wholly responsible for the safety, until proper construction <br /> and protection of the entire improvement until the same has been finally accepted. <br /> GC-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.