My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-00492 - ROW permit
Orono
>
Property Files
>
Street Address
>
D
>
Dickey Lake Drive
>
701 Dickey Lake Drive - 34-118-23-22-0005
>
Permits/Inspections
>
2017-00492 - ROW permit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:56:04 PM
Creation date
1/19/2018 12:19:50 PM
Metadata
Fields
Template:
x Address Old
House Number
701
Street Name
Dickey Lake
Street Type
Drive
Address
701 Dickey Lake Drive
Document Type
Permits/Inspections
PIN
3411823220005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41.4 The CONTRACTOR shall furnish,without cost to the OWNER,all samples of material <br /> for testing purposes that may be required by the ENGINEER. <br /> 41.5 The ENGINEER will make final inspection of all WORK included in the CONTRACT <br /> or any portion thereof,as soon as practicable after written notification by the <br /> CONTRACTOR that such WORK is nearing completion. If such WORK is not <br /> acceptable to the ENGINEER at the time of his inspection,he will advise the <br /> CONTRACTOR in writing as to the particular defects to be remedied before such <br /> WORK can be accepted. If,within a period of ten(10)days after such notification,the <br /> CONTRACTOR has not taken steps to speedily complete the WORK as directed,the <br /> ENGINEER may without further notice and without in any way impairing the <br /> CONTRACT,make such other arrangements as he may deem necessary to have such <br /> WORK completed in a satisfactory manner.The cost of completing such WORK shall be <br /> deducted from any monies due,or which may become due the CONTRACTOR on his <br /> CONTRACT. <br /> 42. DISPUTES AND LITIGATION <br /> 42.1 Any questions arising between the CONSTRUCTION OBSERVER placed upon the <br /> WORK by the ENGINEER and the CONTRACTOR as to the meaning and intent of any <br /> party of the PLANS or SPECIFICATIONS for this improvement shall be immediately <br /> brought to the attention of the ENGINEER and will be resolved by him. <br /> 42.2 Failure on the party of the ENGINEER or his representative to discover and condemn or <br /> reject bad or inferior WORK or MATERIALS shall not be construed as an acceptance of <br /> such WORK or material,or that party of the improvement in which the same may have <br /> been used. <br /> 42.3 To prevent disputes and litigation,it is further agreed by the parties hereto that the <br /> ENGINEER shall determine the volume and quality of the several kinds of WORK <br /> embraced in these improvements. He shall decide all questions relative to the execution <br /> of the WORK and the interpretation of PLANS and SPECIFICATIONS. <br /> 43. CONTRACTOR'S RECORD LOCATIONS AND DOCUMENTATION <br /> 43.1 The CONTRACTOR shall upon completion of the WORK,submit to the ENGINEER, a <br /> set of Record Documents showing the following item: <br /> 43.1a A list of all MATERIALS used on the PROJECT with the manufacturer's name <br /> and model number. <br /> 43.1b Indicate any deviations in alignment and/or grade of utility lines from the <br /> PLANS. <br /> 43.Ic List stationing from the downstream manhole for all sanitary sewer wye <br /> locations. <br /> 43.1d The elevation of the end of all sanitary sewer services. <br /> 43.1e The individual length of all sanitary sewer and watermain services. <br /> GC-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.