Laserfiche WebLink
ACCEPTANCE. The premiums on such BOND shall be paid by the CONTRACTOR. <br /> The MAINTENANCE BOND shall be filed with the CITY prior to the FINAL <br /> PAYMENT for the completed WORK. <br /> 33. TAXES <br /> 33.1 The CONTRACTOR will pay all sales,consumer use and other similar taxes required by <br /> law of the place where the WORK is performed. <br /> 34. UNSUITABLE WEATHER CONDITIONS <br /> 34.1 The ENGINEER shall have the right to stop work during rain or snow storms and all <br /> freshly places WORK,unless otherwise protected,shall be protected by canvas or other <br /> suitable covering in such a manner as to prevent running water from coming in contact <br /> with it. Sufficient covering shall be provided and kept ready for this purpose. The <br /> CONTRACTOR will not be entitled to extra compensation for WORK so stopped or <br /> delayed by the ENGINEER. <br /> 34.2 WORK shall be done at night only in case of emergency and only upon the direction of <br /> the ENGINEER. The ENGINEER has the right to order work to be carried on at night,if <br /> in his opinion,it is for the best interest of the OWNER. WORK performed after dark <br /> shall be adequately illuminated and suitable and sufficient lighting facilities shall be <br /> provided for this WORK. No extra compensation will be allowed to the CONTRACTOR <br /> for WORK under this item. <br /> 35. SUNDAY,HOLIDAY,AND NIGHT WORK <br /> 35.1 No WORK shall be performed between the hours of 6:00P.M. and 7:00A.M.nor on <br /> Sunday or legal holiday without the approval of the OWNER or the ENGINEER. <br /> However,WORK necessary for emergencies or for the protection of equipment or <br /> finished WORK may be done as required. <br /> 36. USE OF EXPLOSIVES <br /> 36.1 If it is necessary to use explosives in the performance of the WORK,the <br /> CONTRACTOR shall take out permits and comply with all the laws,ordinances and <br /> regulations governing same. He shall fully protect all completed WORKS as well as all <br /> overhead,surface,or underground structures and shall be liable for any damage done to <br /> the WORK or to other structures on public or private property and injuries sustained by <br /> persons by reason of the use of explosives in his operations. Explosives shall be handled, <br /> used and fired only by experienced persons. All firing shall be done by electricity. All <br /> explosive supplies shall be safely stored and protected in an approved manner. All such <br /> storage shall be marked clearly"DANGEROUS—EXPLOSIVES." Caps or other <br /> exploders shall not be stored at the place where dynamite or other explosives are stored. <br /> 37. NOISE ELIMINATION <br /> 37.1 The CONTRACTOR shall eliminate noise to as great an extent as possible at all times. <br /> Air compressing plants,shall be equipped with silencers and the exhausts of all gasoline <br /> motors or other power equipment shall be provided with mufflers in accordance with <br /> current government regulations. <br /> GC-22 <br />