Laserfiche WebLink
30. ENGINEERS AUTHORITY <br /> 30.1 The ENGINEER shall act as the OWNER'S representative during the construction <br /> period. He shall decide questions which may arise as to quality and acceptability of <br /> MATERIALS furnished and WORK performed. He shall interpret the intent of the <br /> CONTRACT DOCUMENTS in a fair and unbiased manner. The ENGINEER will make <br /> visits to the site and determine if the WORK is proceeding in accordance with the <br /> CONTRACT DOCUMENTS. <br /> 30.2 The CONTRACTOR will be held strictly to the intent of the CONTRACT <br /> DOCUMENTS in regard to the quality of MATERIALS,workmanship and execution of <br /> the WORK. Inspections may be made at the factory or fabrication plant of the source of <br /> material supply. <br /> 30.3 The ENGINEER will not be responsible for the construction means,controls,techniques, <br /> sequences,procedures,or construction safety. <br /> 30.4 The ENGINEER shall promptly make decisions relative to interpretation of the <br /> CONTRACT DOCUMENTS. <br /> 31. LAND AND RIGHTS-OF-WAY <br /> 31.1 Prior to issuance of NOTICE TO PROCEED,the OWNER shall obtain all land and <br /> rights-of-way necessary for carrying out and for the completion of the WORK to be <br /> performed pursuant to the CONTRACT DOCUMENTS,unless otherwise mutually <br /> agreed. <br /> 31.2 The OWNER shall provide to the CONTRACTOR information which delineates and <br /> describes the lands owned and rights-of-way acquired. <br /> 31.3 The CONTRACTOR shall provide at his own expense and without liability to the <br /> OWNER any additional land and access thereto that the CONTRACTOR may desire for <br /> temporary construction facilities,or for storage of MATERIALS. <br /> 32. GUARANTY <br /> 32.1 The CONTRACTOR shall guarantee all MATERIALS and equipment furnished and <br /> WORK performed for a period of one(1)year from the date of FINAL ACCEPTANCE. <br /> The CONTRACTOR warrants and guarantees for a period of one(1)year from the date <br /> of FINAL ACCEPTANCE of the system that the complete system is free from all defects <br /> due to faulty MATERIALS or workmanship and the CONTRACTOR shall promptly <br /> make corrections as may be necessary by reason of such defects including the repairs of <br /> any damage to other parts of the system resulting from such defects. The OWNER will <br /> give notice of observed defects with reasonable promptness. In the event that the <br /> CONTRACTOR should fail to make such repairs, adjustments,or other WORK that may <br /> be make necessary by such defects,the OWNER may do so and charge the <br /> CONTRACTOR the cost thereby incurred. <br /> 32.2 The CONTRACTOR shall,upon FINAL ACCEPTANCE of the WORK or a part thereof, <br /> submit a MAINTENANCE BOND,in the amount of the value of the completed WORK, <br /> guaranteeing the WORK to the CITY for a period of one(1)year from the date of FINAL <br /> GC-21 <br />