Laserfiche WebLink
Final Plat Application 16-3860 <br />Kintyre Preserve <br />Page 2 <br />1.6 Record drawings must be submitted upon completion of the project. As -built survey shots on the <br />pond must be obtained after construction sediment is removed and side slopes re -dressed. <br />2.0 STORMWATER MANAGEMENT PLAN: <br />2.1 A final Stormwater Management Plan matching improvements proposed must be submitted to <br />verify plan meets all requirements. Per City requirements, proposed peak runoff rates for the 2, <br />10, and 100 year 24 hour precipitation events must be restricted to less than existing peak rates for <br />the same events. Per NPDES requirements, any project that results in 1 acre or more new <br />impervious surface at ultimate development must provide volume retention equal to I" runoff from <br />the new impervious surfaces. All stormwater management facilities should be designed to <br />accommodate ultimate development. <br />2.2 Per NPDES requirements, the proposed pond must provide 1,800 cf storage below the outlet for <br />each acre draining to it. Calculations confirming sizing should be submitted. <br />2.3 The sump should be removed from the pond outlet control structure. The inlet pipe should flow <br />backward to pond to allow for future maintenance. The proposed weir will control the normal <br />water level. <br />3.0 FINAL PLAT: <br />3.1 Horizontal curves for streets with a design speed of 30 mph must provide a minimum 275' radius. <br />Several curves within Outlot B do not meet the minimum requirement. The Plat should either be <br />revised or variances would be required. <br />3.2 Drainage and Utility easements should be provided to cover all stormwater management facilities <br />(i.e. storm sewer, swales, ditches, and ponds). Easements should be shown on Final Grading and <br />Utility Plans in order to verify coverage. Easements may need to be adjusted in order to <br />accommodate revisions necessary to gain City approval. <br />3.3 Standard Wetland Conservation and Flowage Easements should be provided over all wetlands. <br />The Final Plat should indicate Drainage Easements only over wetlands and wetland buffers. <br />4.0 FINAL SITE PLAN: <br />4.1 The new driveway to Lot 5 should be installed at the same time Kintyre Lane is constructed, and <br />the existing driveway should be removed. The new driveway location should be indicated on the <br />plans. <br />4.2 Removal items not depicted on the other plans should be noted for demolition on this overall plan. <br />These items include the construction access driveway, the portion of driveway removed that use to <br />serve Lot 5, and various structures to be demolished. <br />5.0 FINAL GRADING PLAN: <br />5.1 The grading necessary to remove the existing driveway to Lot 5 should be indicated on the plan. <br />Any existing culvert present should be removed, and the drainage way should be restored to pre - <br />development conditions. <br />5.2 The swale alignment between Kintyre Lane and the pond should be revised as necessary to <br />minimize impact to Wetland #3. A minimum 10' wide berm should be provided between the <br />wetland edge and swale to minimize potential for changing wetland hydrology. <br />