Laserfiche WebLink
Final Plat Application 16-3860 <br />Kintyre Preserve <br />Page 3 <br />5.3 Proposed building pads do not fit topography in a few locations as follows: <br />a. Lot 2 — a driveway over 12% would be required, existing topography slopes 18% across pad, <br />and extensive retaining wall would be required. Further consideration should be given <br />regarding mass grading of this lot and raising the pad elevations. <br />b. Lot 3 — the proposed walkout elevation is 3' below the adjacent drainage swale bottom. <br />Grading should be revised or the proposed pad elevation raised to minimize potential for <br />runoff to be directed into the structure. <br />5.4 The grading around the pond should be revised to provide a minimum 1' freeboard from the 100 <br />year high water level to the top of the berm. The bottom of the emergency overflow should be <br />located at the 100 year high water elevation. <br />6.0 FINAL STREET PLAN: <br />6.1 Several horizontal curves do not meet the minimum 275' radius requirement for streets with a <br />design speed of 30 mph. The three small curves near the connection to the existing street should <br />be removed, and the radius of the curve at approximately station 5+00 should be increased slightly <br />to the minimum. <br />6.2 The typical section for the shoulder in the rural section should be included on the plan. <br />6.3 Notes detailing procedure and schedule for connection of new street to existing Kintyre Lane <br />should be included with plan. Bituminous pavement should be saw -cut for clean match lines. <br />Enough existing curb and gutter should be removed to install 15' radii to the new alignment. Final <br />extent of existing infrastructure removal shall be coordinated in field with City prior to any <br />demolition. Notes should also include schedule for removal of Construction access. <br />7.0 FINAL UTILITY PLAN: <br />7.1 Inverts indicated for FES 1, CB2, and CB3 do not match proposed grading. It appears inverts <br />should be adjusted approximately 6.0' up. <br />7.2 Inverts should be provided for draintile installed in filtration shelf to ensure system is correctly <br />installed. Draintile should be extended to high water level on "dead-end" runs, and cleanouts <br />installed at terminations to allow for maintenance. <br />7.3 Castings should be indicated on plan for inlets. Neenah casting R -3067-V is recommended. <br />7.4 Notes should be included to indicate that a 15" culvert must be installed at driveway connections <br />to the street for those lots along the rural section when the house is constructed. <br />8.0 FINAL EROSION CONTROL PLAN: <br />8.1 Notes should indicate perimeter erosion control measures and protection fencing will be installed <br />by Contractor and inspected by City prior to any demolition or land disturbance. Contractor must <br />provide 24 hour notice prior to inspection. <br />8.2 Erosion control blanket should be installed on slopes of 3:1 and swales/ditches. Hatching should <br />be indicated on the plan to ensure adequate coverage. <br />8.3 Turf reinforcement mat should be installed where the curb and gutter transitions to ditches in order <br />to minimize potential for erosion. <br />8.4 Inlet protection should be installed on existing Kintyre Lane on the first inlets downstream from <br />the project site. <br />