Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br />Department Approval: <br />Name Scott Oberaigner <br />Title Public Works Supervisor <br />Administrator Reviewed: <br />Y"-4 <br />Item Description: Lift Station 28 Pump Replacement <br />DATE: October 10, 2016 <br />ITEM NO.: 4 <br />Agenda Section: <br />City Engineer's Report <br />1. Purpose. The purpose of this action is to gain Council approval to replace a failed sewer <br />pump at Lift Station 28. <br />2. Background. The Sewer Department has identified a failed sewer pump (one of two pumps) <br />at Lift Station 28 (632 Park Avenue). The pump has a bent shaft and was placed into service in <br />1996. Expected life of one of these pumps is approximately 20 years. Currently we are using a <br />rental pump to maintain pump redundancy at the lift station. <br />3. Scope. Replacement of one Flygate CP3152 Pump and accessories and installation at lift <br />station 28. <br />4. Cost. The cost to replace the pump is $15,300.00. The City solicited quotes from three vendors <br />and the low quote was from Quality Flow Systems, Inc. <br />Bidder <br />Bid <br />Quality Flow Systems, Inc <br />$15,300 <br />Quality Flow Iowa, Inc <br />$15,400 <br />KSB, Inc. <br />$18,985 <br />5. Funding. This replacement will be funded from the Sewer Operating Budget. This will <br />cause the Repairs/Maintenance - Sewer Lines / Lift Stations to exceed its 2016 budget by <br />approximately $8800. <br />COUNCIL ACTION REQUESTED <br />Motion to approve replacement of Sewer Pump at Lift Station 28. <br />