Laserfiche WebLink
REQUEST FOR COUNCIL ACTION <br />DATE: October 10, 2016 <br />ITEM NO: 5 <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Adam T. Edwards Y"-4 Public Works Director/ <br />Title Public Works Director City Engineer's Report <br />Item Description: Lift Station #2 Backup Generator Award <br />Exhibits <br />A. Bolton and Menk Letter <br />1. Purpose. The purpose of this action item is to gain Council approval to award the contract <br />for backup generator for Lift Station #2. <br />2. Background. Lift Station #2 is a critical lift station, collecting sewage from the areas of <br />Crystal Bay, Weber Hills and Heritage Lane. It then coveys that sewage into the Met Council <br />sewer main. Under current load the lift station can backup within 20 minutes of a loss of power. <br />The City has had aspirations of providing a backup generator for the lift station for some time <br />but was unable to acquire access to land immediately adjacent to the lift station. Last summer <br />the City was approach by the owners of the 1955 Shoreline Drive, offering to provide <br />space/easement for the placement of a backup generator for LS #2. In addition in July 2015 the <br />City received a letter and petition from area residents requesting a backup generator for LS #2. In <br />September 2015 the Council authorized the design and engineering of the backup system. In <br />August 2016 the Council approved the design and authorized solicitation for bids. <br />3. Project Scope. Adding a permanent, natural gas driven, generator; installing electrical <br />distribution cabling under CSAH 15 and potentially replacing the existing control panel <br />4. Cost. The lowest bid was from Pember Companies for $170,550.00. A summary of bids is in <br />the table below. The Engineers estimate was for $175,785. Bolton and Menk provided an estimate <br />for construction oversight of not to exceed $13,770. (Exhibit A) <br />Bidder <br />Bid <br />Pember Companies <br />$170,550.00 <br />Minger Construction <br />$195,500.00 <br />Premier Electrical <br />$257,500.00 <br />5. Funding. This project will be funded through the Sanitary Sewer Enterprise Fund. Estimated <br />2016 End -of -Year balance is $1,777,524. <br />COUNCIL ACTION REQUESTED: <br />Move to award the lift Station #2 Back up Generator contract to Pember Companies for <br />$170,550.00 and to authorize Bolton and Menk to provide construction management services. <br />