My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-10-2016 Council Packet
Orono
>
City Council
>
2016
>
10-10-2016 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 2:06:44 PM
Creation date
11/28/2017 3:09:32 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
465
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Final Plat Application 16-3867 <br />Tanager Estates <br />Page 4 <br />4.5. Grading for the outlet of Infiltration Basin -1 should be revised to indicate a weir, as defined on the <br />Final Details Plan. <br />4.6. Grading for the outlet of the.Pond should be revised to incucate a pipe from the outlet control structure <br />into the pond. <br />4.7. A berm should be provided around the Pond and Infiltration Basin -1, with the top of berm a minimum <br />I' above the adjacent 100 year high water level. The emergency overflow for the Pond should be <br />placed at the Pond's 100 year HWL (938.6) and be a minimum 10' wide. The access berm between <br />the Pond and Infiltration Basin -1 should be a minimum 8' wide to allow for maintenance of the outlet <br />control structure and emergency overflow. <br />4.8. Double siltfence must be provided for any work indicated within 50' of a wetland. <br />4.9. Erosion control blanket should be indicated on all slopes of 3:1 to be installed in conjunction with final <br />stabilization. <br />4.10. Erosion control blanket should be provide between the curb cut on Lot 2's driveway and Rain Garden - <br />2 to minimize potential for erosion. <br />Final Wetland Buffer Monument Pian <br />5.1. Tree Preservation Monuments, as required by the Preliminary Plat Approval resolution, should be <br />included on the Monument Plan <br />Final Details Plan <br />6.1. The outlet for Infiltration Basin -1 is indicated to be a 0.5' weir. A detail should be provided for the <br />weir in order to verify adequate design. Due to the small opening, a poured concrete weir tied back <br />into the earth bank on each side is recommended. The bottom of the weir should be placed at the <br />starting water level indicated in the calculations (936.0). A 10' wide tier should be provided at the 100 <br />year high water level (938.1) to provide an emergency overflow for extreme events. The top of the <br />weir should be placed 1' above the 100 year HWL (939.1) to match the top of the berm. <br />6.2. The detail for the Standard Skimmer Structure (STO-8A) should be revised as follows: <br />a. The Skimmer Opening should be replaced with a pipe flowing from the structure to the pond. <br />Back slope on the pipe will allow for flushing during future pond maintenance. <br />b. The sump should be removed from the structure, and the inlet pipe should be placed directly at the <br />bottom. A sump in this location would be difficult to maintain. <br />c. The lower rim of the structure should be placed at the 100 year high water level. <br />6.3. Notes should be added to the Infiltration Rain Garden Detail to provide direction regarding sequencing <br />and construction. Infiltration areas should be constructed after all upstream areas are permanently <br />stabilized. Construction should be performed by low impact equipment to minimize compaction. <br />Please let me know if you have any questions or need additional information. <br />Sincerely, <br />BOLTON & MENK, INC. <br />,Qg <br />6-4 <br />Robert E. Bean, Jr., P.E. <br />Water Resources Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.