Laserfiche WebLink
I. The Engineer has performed a field survey to ascertain existing site conditions. This � <br /> survey was visual only and no attempt was made to verify exact conduit rouring above <br /> ceilings or in walls. The Contractor shall thoroughly review demolirion and � <br /> construction Drawings and Specifications and be fully aware of design intent. <br /> Additional work required due to deviarions found after ceilings and walls are opened up <br /> shall be performed at no additional cost to the Owner. � <br /> END OF SECTION <br /> � <br /> � <br /> � <br /> � <br /> � <br /> � <br /> � <br /> � <br /> � <br /> � <br /> � <br /> ' <br /> � <br /> � <br /> 071197 CBA701 8/1/97 � <br /> 15020 - 2 <br /> � <br />