My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Irrigation well project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Irrigation well project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:04:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> 2.02 TOOI.S <br /> A. All speciai tools roquired for servicing equipment fumished shall be delivered,properly identified , <br /> as to ose,w the Owner prior to acceptance of the wak. Adapters,electrical and other equipment <br /> necessary for servicing and maintaining the system shall aLso be delivered to the Owner in the ' <br /> same manner. <br /> 2.03 II�TSPECTION ' <br /> A. The Contra�ctor shall inspect all the electrical equipment and shall notify the Engineer in wridng <br /> before the equipment is installed if the eqaipment appears to be deficient in fit,fam or function ' <br /> 2.04 TEMPORARY WIItING <br /> A. It is necessary that the facility be kept in continuous opera6on during conswcdon and change- ' <br /> over. The Contractor shall furnish all required equipment and perfam all temporary wiring <br /> required to maintain operadon of the facility d�ring conswction and for malang changeovers. , <br /> The Cont�actor shall be responsible for maintenance of the tempornry facilities during the <br /> conswction process. <br /> B. The Contiactor shall coordinaie construcdon and chan eover uences with the En ' eer,Owner, � <br /> S � 8� <br /> and other a�'ectsd perties. , <br /> 2.05 CONSTRUCITON <br /> A. The Cont:actor,under this portion of the coneract,shall be responsible for all cutting,patching, , <br /> excavadon,bacicfill,sleeves,ct�ases,openings,etc.far equipment specified in this portion of the <br /> contract documents or for cable and conduit and associated electrical equipment that is specif'ied ' <br /> in this portion of the cont:act documents to save equipment that is provided by a different <br /> portion of the.se docnments. If the Canuactor provides equipment that has power and control <br /> requirements that are different from those spacified,then that Contractor shall be responsible fa � <br /> any addiaonel costs incun+ed for engincering, conswction, and all wiring changes required to <br /> make the altemate equipment perform pa the intent of the conuact documents. <br /> B. All patching. cuuing. etc. shall have a £mish that is comgaa'ble with the final finish of the , <br /> remainder of die surface and shall meet with the approval of the Engineer. <br /> 2.06 COORDINATION ' <br /> A It shall be the sole respons�bility of the Contcactor w coordinate among sappliers and contractnrs , <br /> providing equipment for the prnject <br /> B. The coordination shall include. but not be limited to, gas and liquid pressures and flows, , <br /> r�strictions, operators,reference points, input and output resistance,power requirements, etc. <br /> , <br /> TS-5-1-4 ` <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.