Laserfiche WebLink
, <br /> 2.02 TOOI.S <br /> A. All speciai tools roquired for servicing equipment fumished shall be delivered,properly identified , <br /> as to ose,w the Owner prior to acceptance of the wak. Adapters,electrical and other equipment <br /> necessary for servicing and maintaining the system shall aLso be delivered to the Owner in the ' <br /> same manner. <br /> 2.03 II�TSPECTION ' <br /> A. The Contra�ctor shall inspect all the electrical equipment and shall notify the Engineer in wridng <br /> before the equipment is installed if the eqaipment appears to be deficient in fit,fam or function ' <br /> 2.04 TEMPORARY WIItING <br /> A. It is necessary that the facility be kept in continuous opera6on during conswcdon and change- ' <br /> over. The Contractor shall furnish all required equipment and perfam all temporary wiring <br /> required to maintain operadon of the facility d�ring conswction and for malang changeovers. , <br /> The Cont�actor shall be responsible for maintenance of the tempornry facilities during the <br /> conswction process. <br /> B. The Contiactor shall coordinaie construcdon and chan eover uences with the En ' eer,Owner, � <br /> S � 8� <br /> and other a�'ectsd perties. , <br /> 2.05 CONSTRUCITON <br /> A. The Cont:actor,under this portion of the coneract,shall be responsible for all cutting,patching, , <br /> excavadon,bacicfill,sleeves,ct�ases,openings,etc.far equipment specified in this portion of the <br /> contract documents or for cable and conduit and associated electrical equipment that is specif'ied ' <br /> in this portion of the cont:act documents to save equipment that is provided by a different <br /> portion of the.se docnments. If the Canuactor provides equipment that has power and control <br /> requirements that are different from those spacified,then that Contractor shall be responsible fa � <br /> any addiaonel costs incun+ed for engincering, conswction, and all wiring changes required to <br /> make the altemate equipment perform pa the intent of the conuact documents. <br /> B. All patching. cuuing. etc. shall have a £mish that is comgaa'ble with the final finish of the , <br /> remainder of die surface and shall meet with the approval of the Engineer. <br /> 2.06 COORDINATION ' <br /> A It shall be the sole respons�bility of the Contcactor w coordinate among sappliers and contractnrs , <br /> providing equipment for the prnject <br /> B. The coordination shall include. but not be limited to, gas and liquid pressures and flows, , <br /> r�strictions, operators,reference points, input and output resistance,power requirements, etc. <br /> , <br /> TS-5-1-4 ` <br /> � <br />