Laserfiche WebLink
� 2.07 ERECTTON AND INSTALLATION SUPERVISION <br /> � A. The manufacwrer or single sou�e supplier of equipment included in each secdon shall supervise <br /> or otherwise direct the proper installaaon or erecdon of all equipment included in that secaon. <br /> , 2.08 FTELD TESTII�IG <br /> ' A Field testing shall be performed as spacified under the detailed specifications for the specific <br /> equipment item. The Contractor shall also aUow time for overaU testing at completion of the <br /> itrigation system by others. <br /> , 2.09 INSTALLATION <br /> ' A. Each item shall be fumished complete and installed in accardance with the manufacturer's <br /> rxommendations,inswctions and direcdons. All installed equipment shall be properly protect� <br /> during subsequent construction operations. <br /> , B. Oil, grease and other fluids nxessary fa initial operations shall be vided b the Contr�ctor <br /> Pi'o Y <br /> in quanddes and grades recommended by the manufacwrer. <br /> , C. All material shall be new, undamage� and conform to the latest standards for the applicable <br /> equipment <br /> ' D. The Contractor shall provide all scaffoldin uired for tl� ro installation of this work in <br /> 8�1 P P� <br /> , conformance with the standards of all local and state safety codes applying W scaffolding. <br /> E. Cooperate with other trades to avoid int�rferences in the installation of this w�k. Install all <br /> , equipment and systems so as not to delay progress of construction and correlate with other trades <br /> to avoid delay. Should differences of opinion develop, the Enginaer's decision will be final. <br /> , F. The Cont�actor shall keep the premises clean and orderly during installation of this work,remove <br /> rubbish pe,rialically and as may be directed by the Enginar. Upon completion of this pazt of <br /> the project,rEmove all dirt,debris,tools� scaffolding,etc. used or re,sulting from this work. <br /> , G. All connections to existing facility circuitry and piping and all modifications to,a relocation of, <br /> existing cucuitry and piping required for proper installation of new equipment shall be pursued <br /> , on a continuous basis and shall be coordinatzd with the Engincer so as to cause a minimum of <br /> shut down time in any existing facilides, as may be applicable. <br /> , H. All electrical equipment subject to im�ct loadings from contact a brealcer operarion and all <br /> equipment subject W potential stresses from fault•current a subsequent pmtective device <br /> opexation shall be adoquately bolted in place,braced�etc. to resist the mechanical fom.es. <br /> , <br /> , <br /> ' TS-5-1-5 <br /> , <br />