My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Irrigation well project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Irrigation well project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:04:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 2.07 ERECTTON AND INSTALLATION SUPERVISION <br /> � A. The manufacwrer or single sou�e supplier of equipment included in each secdon shall supervise <br /> or otherwise direct the proper installaaon or erecdon of all equipment included in that secaon. <br /> , 2.08 FTELD TESTII�IG <br /> ' A Field testing shall be performed as spacified under the detailed specifications for the specific <br /> equipment item. The Contractor shall also aUow time for overaU testing at completion of the <br /> itrigation system by others. <br /> , 2.09 INSTALLATION <br /> ' A. Each item shall be fumished complete and installed in accardance with the manufacturer's <br /> rxommendations,inswctions and direcdons. All installed equipment shall be properly protect� <br /> during subsequent construction operations. <br /> , B. Oil, grease and other fluids nxessary fa initial operations shall be vided b the Contr�ctor <br /> Pi'o Y <br /> in quanddes and grades recommended by the manufacwrer. <br /> , C. All material shall be new, undamage� and conform to the latest standards for the applicable <br /> equipment <br /> ' D. The Contractor shall provide all scaffoldin uired for tl� ro installation of this work in <br /> 8�1 P P� <br /> , conformance with the standards of all local and state safety codes applying W scaffolding. <br /> E. Cooperate with other trades to avoid int�rferences in the installation of this w�k. Install all <br /> , equipment and systems so as not to delay progress of construction and correlate with other trades <br /> to avoid delay. Should differences of opinion develop, the Enginaer's decision will be final. <br /> , F. The Cont�actor shall keep the premises clean and orderly during installation of this work,remove <br /> rubbish pe,rialically and as may be directed by the Enginar. Upon completion of this pazt of <br /> the project,rEmove all dirt,debris,tools� scaffolding,etc. used or re,sulting from this work. <br /> , G. All connections to existing facility circuitry and piping and all modifications to,a relocation of, <br /> existing cucuitry and piping required for proper installation of new equipment shall be pursued <br /> , on a continuous basis and shall be coordinatzd with the Engincer so as to cause a minimum of <br /> shut down time in any existing facilides, as may be applicable. <br /> , H. All electrical equipment subject to im�ct loadings from contact a brealcer operarion and all <br /> equipment subject W potential stresses from fault•current a subsequent pmtective device <br /> opexation shall be adoquately bolted in place,braced�etc. to resist the mechanical fom.es. <br /> , <br /> , <br /> ' TS-5-1-5 <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.