Laserfiche WebLink
1.03 SUBMITTALS ' <br /> A. The Conuactor shall submit for approvai complete shop details for all equipment including but , <br /> not limiced to: <br /> 1. Lighting and distribution panels � <br /> 2. Switchgear <br /> 3. Motors <br /> 4. Cable , <br /> S. Conduit <br /> 6. Otha devices and systems,including complete schematic and interconnecdon diagiart►s, , <br /> along with detailed paRs lists and other infom�ation required by the Engineer. <br /> 8. Submittal shall be in compliance with applicable paragraphs of the project manual. � <br /> C. Operating and maintenance manoals shall be provided as defined in the project manual. The <br /> manual shall include a canplete parts lisk The manuals shall be submitted with the shop ' <br /> drawings. <br /> D. Submit�ls shall include complete schemadc d.iagrams of individual devices and system diagrams. , <br /> Manufacturer's standard "cut sheets" are not acceptable. <br /> 1.04 ALTERNATES, SUBSTI'I'�JTTONS , <br /> A See the General and Supplementary Conditions and Division 1. <br /> 1.OS NAMEPLATES , <br /> A. Each piece of equipment shall have a standard nameplate securely affixed in a conspicuous place, � <br /> showing the manufacwrer,model number and serial munbe,r as is applicable. The namepiate of <br /> the distrib�ting agent only will not be acceptable. , <br /> 1.06 QUALITY <br /> A. All wak shall be installed by skilled mechanics in a neat and wakmanlike manner and shall be ' <br /> . approvefl by the Engineer before final acceptance by the Owner. <br /> B. If equipment is furnished having power and control requirements other than as specified, the e <br /> Contractor shall maks all nocessa�y changes and furnish a complete set of drawings for ins�lling <br /> the alternate cquipm�t The installadon shall comply with the requimanents of the 1990 edidon ' <br /> of the National Electrical Code,local and state codes and ordinances. Where the contract docu- <br /> ments call fa worlananship or matecials in excess of code requirements,the project manoal shall <br /> take precedence. Electrical equipment and mataials shall be Underwriter's Laboratory approved, , <br /> where U.L. standards fa such products exis� <br /> , <br /> TS-5-1-2 , <br /> � <br />