My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Irrigation well project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Irrigation well project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:04:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IDMSION 5 <br /> ELECTRICAL <br /> , SECITON 1 <br /> ELECTRICAL GENERAL PROVISIONS <br /> , <br /> PART 1: GEIVERAL <br /> ' 1.01 DESCRIPTION <br /> , A Related Dociunents \ <br /> 1. Bidding Reqnirements, Conditions of d�e Contract and pertinent potions of previo�s <br /> , Divisions and Secdons of these Specifications apply to the Work of this Secdon as fully <br /> as though repeated herein. <br /> , B. TI�CONTRACTOR SHALL ALSO REFER TO TI�OTHER DMSIONS OF TF�PLANS <br /> AND SPECIFTCATIONS FOR INFORMATION VVI�IICH PERTAINS'PO TI�ELECTRICAL <br /> � SECTION. <br /> C. The work included in the project shall include the furnishing of all required labo�and materials <br /> ' f�a complete and operable electrical system as indicated on the accompanying drawings and as <br /> required by the project manual inclusive of all appurcenances not specifically shown a covered <br /> by the specifLcations but roquired for complete operation of the electrical system as defined in <br /> , the documents. 'Ihe work shall aLso include the tesoing,adjustment,start-up and troubleshooting <br /> of the elect�rrical equipment and the tcaining of the Owner's operating pe�sonnel in its operadon <br /> and maintenance. <br /> � D. It shall be the nsibili of the Contractor to furnish a com lete and full o ratin s stem. <br /> �Po tY P Y Pe S Y <br /> , The Cont�actor shall be responsible for all details which may be necessary �o groperly install, <br /> adjust and place in opexation the complete installadon. The Contractor shall assume full <br /> responsibility for additional costs which may result from unauthorized deviations from the <br /> , convact documents. <br /> 1.02 VERIFICATION OF DRAWII�IGS <br /> , A. The contract drawings indicate the roquired siu of conduit and cable for wiring. T7�e locations <br /> of equipment shall be vuified in the field by the Contractor. In the event it should become <br /> ' necessa�y to change du locadon of any work due W intaference with other work,ca►sult with <br /> the Engineer before maldng any changes. 'I�e ContrBcror shall dete�mine and be responsible for <br /> the proper location and ct�acter of all ancha bolts, inserts, hangers� sleeves, etc. for the <br /> , electrical eq►upment,unless specifically detailed othawise. <br /> ' <br /> � TS-5-1-1 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.