My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Irrigation well project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Irrigation well project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:04:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, human eaor, test pumping shall be restarted from the beginning; no compensadon will <br /> be made for the unsuccessfiil pe,riod of test pnmping. The Contractor will be paid at the <br /> � unit price for the number of hours of test pumping. Said payment will consdtute full <br /> payment for labor�equipment and materials used to operate the test pumping equipmen� <br /> , 3.4.5 Well Abandonment(D�e to Geolo�ric Condiaons) <br /> , Labor, oquipment and materiais for borehole abandonment will be considered incidental to the <br /> worlc. <br /> , 3.4.6 Furnish and Inststll Pumo, Droo Pive,and Surface Plate <br /> The Convactar will be paid on a lump sum basis for furnishing and installing the submersible <br /> � p�unp,drop pipe,surface plate and related wodc as specified Said payment will constitute full <br /> compensation for all labor,equipment, and materials necessary to furnish and install the pump, <br /> �P P1Pe and surface plate and related work spe�ified. <br /> � 3.4.7 Well Disinfection and SamDlinR <br /> � The Conlractor will be paid a lump sum to disinfect and sample the well. The Contractor shall <br /> be paid for disinfection one time only. Payment will consdwte full compensation for all labor, <br /> eqnipment,and mat�rials necessary to disinfect and sample the well as specified. <br /> ' 3.4.8 Concrete Slab and Box Cov� <br /> , The Contractor will be paid on a lump sum basis for furnishing and installing the concrece slab, <br /> reinfomement,and steel box cove,r and related work as specified. Said payment will constitute <br /> � full compensadon for all labor, equipment, and materials necessary to fiunish and install the <br /> co�rete slab,reinfarcement,and steel boa crner and related work specified. <br /> , <br /> � <br /> � <br /> 1 <br /> i <br /> 1 <br /> , TS-3-11 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.