3.4.1.5 Fumish and Install Neat Cement Grout � <br /> Neat cement grout will be measured by the bags of cement placed to the nearest bag. The , <br /> Contractor will be paid at the�nit price bid for the bags of cement placed. Said payment <br /> will consdWte full compensation for labor,equipment and materials used for fumishing � <br /> and installing the cement grou� <br /> 3.4.2 Plumbness and Ali�mment Tests � <br /> The Contr�ctor will be paid for conducting one plumbness and alignment test made upon � <br /> compledon of the well and other alignment tests as stated in these Specifications. Said payment <br /> will constitute full compensadon for labor. equipment and materials used to conduct the <br /> plumbness and alignment tests. � <br /> 3.4.3 Well Develooment <br /> 3.4.3.1 Furnish,Install and Remove Development Equipment � <br /> The Convactor will be paid on a lump sum basis for fumishing,installing and removing � <br /> the well development equipment, includ.ing apparatus necessary far the sand tesG Said <br /> payment will constitute full compensation for labor. equipment and materials used to <br /> f�rnish, install and remove the development equipmen� � <br /> 3.4.3.2 Operate Development Equipment , <br /> Well developmeat will be meas�red in the hours that the water is pumped from each well <br /> w the nearest 0.1 hour. The Conttacwr will be paid at the unit price for the number of , <br /> hours of developing. Said payment will consdtute full compec�sation for labor,equipment <br /> and materials used o0 opecate the development equipment and perform the sand test� <br /> 3.4.4 Test Pmm�ina ' <br /> 3.4.4.1 Furnish,Install, and Remove Test Pumping Equipment � <br /> The Conuactar will be paid an a lump sum basis fa fumishing,installir►g,and removing <br /> the test pumping equipment including a power soume for the pump and the necessary � <br /> materials for the discharge line. Said payment will consdtute full compensation for labor, <br /> equipment and mataials used to fumish.install and remove the test pumping equi}xnen� <br /> � <br /> 3.4.4.2 Operate Test Pumping Equipment � <br /> Test pumping will be measured in the hours that water is pumped from the well to the <br /> nearest 0.1 hour. If the test pump pracedure is intenupted due to problems aaributed to � <br /> the Convactor,such as equipment problems,Ca�tractor-supplied power-source failure,and <br /> TS-3-10 ' <br /> � <br />