My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Irrigation well project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Irrigation well project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:04:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, DIVISION 4 <br /> , BOOSTER PUMP, VALVES, AND PIPING <br /> , 4.1 SCOPE OF WORK <br /> The scope of work covered by this section of these Specifications include furnishing all labor,equipment, <br /> , and materials and performing all operations ne�essary to install a booster pump,pressure tank and related <br /> valves and piping. The work ir�cludes,but is not limited to,furnishing and installing the booster pump, <br /> pressure tank, valves and related piping,and all other work specified. <br /> , 4.1.1 General Location <br /> , The general location of the project is given in the scope of work in Division 1. The site locatian <br /> is shown on Figure 1. 'I]�e booster pump and pressure tank will be located in the exisang <br /> Maintenacxe Shop adjacent to the water tower on-site as located by the Owne�s Representative. <br /> , The ne�essary valves and piping shall be inside the Maintenance Shop were possible as directed <br /> by the Owne�'s Representative. The Contractor shall not move the location without approval of <br /> the Owner. <br /> , 4.2 MAT'ERIAI.S <br /> ' 4.2.1 Well Discharae Line <br /> ' The well discharge line shall be 2-inch schedule 40 galvanized pipe and fittings. <br /> 4.2.2 Ductile Iron Pive and FittinAs (DIP) <br /> � D�ictile iron pipe with threaded flanges shall conform to all the requirements of ANSI A21.15. <br /> Pi��e barrel shall meat all the requirements of ANSI A21.51. Pipe shall be Class 53. <br /> , All bolts and gaskets necessary shall meet the requirements of ANSI A21.15. Bolts shall be <br /> ca��bon steel conforming to the requirements of ASTM A307,Grade B,with hex heads and nuts <br /> � sized acco�dingly. Gaskets shall be the ring type constructed of synthetic rubber material suitable <br /> for use in pipes containing potable water. <br /> � 4.2.3 Polvvir►vl Chlaride Pioe and FittinAs (PVC7 <br /> Smooth walled polyvinyl chloride pipe and fittings shall conform with the requirements of ASTM <br /> ' D-3034 for the size,standard dimension ratio(SDR),and stma►gth requirements indicated on the <br /> Drawings. The grade used shall be resistant to aggressive soils or corrosive substances in <br /> ' acc:ordance with the requirements of ASTM-D543. <br /> � <br /> 1 TS-4-1 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.