My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Irrigation well project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Irrigation well project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:04:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2.3 Dail R � <br /> The Conuactor shall kcep a continuous recad of the nature of the material ' <br /> encounterad and shall make and keep available at the job site, a daily report <br /> describing the work done during each day,including the items of work accomplishe� � <br /> such as the depth drilled,the casing set,the number of cement grout bags furnished <br /> and installod, the water �vel in rhe well at the beginning of each shift, and other <br /> peRinent data as requested by the Engineer. Upon compledon of the well, the � <br /> Contractor shall fuinish a oopy of the daily reports to the Engineer. <br /> 2.3 WORKMANSHIP ' <br /> 2.3.1 Site Securitv <br /> The conswctia► area shall be fenced from the start to the completion of tl�work. ' <br /> The Contracta shall be solely responsible for the secority of the Cont�cto�s <br /> equipment and materials while they are on the site or in transit,including providing � <br /> any ins�uance against theft, damage or vandalism that the Contractor deems <br /> appropriate. Security measures deemed necessary by the Contractor shall be provided <br /> at the Contracto�s expense and no additional compensation shall be provided. � <br /> 2.3.2 Clean Uu and Resta�ation <br /> At the can letion of the work relat�ed to well construction develo ent and test ' <br /> P � Pm <br /> pumping,pump installadon,and relatsd piping the Conaacta shall remove all tools, � <br /> conswcdon equipment and machinery as well as all waste materials, rubbish and <br /> debris from and about the premises. 'Il�e Contractor will be responsible for removing <br /> from the site and disposing of cuttings and materials from the drilling process. The ' <br /> Contractor will be responsible fa restoration of the access and site by placing topsoil. <br /> regrading.and seeding any damaged areas. <br /> 2.4 METHOD OF MEASUREMENT AND PAYMENT , <br /> The Conaactor will be paid for mobilization an the basis of a lump sum price. Contracwr shall , <br /> submit a detailed cost summary of all items included in the bid item for Mobilization. The <br /> Conuractor shall submit records of payment of applicable items in the Request for Payment,such <br /> as bond and insinance costs.equipment mobilization,reswration,and shall fully justify any other � <br /> cost item. This summary will be used for deteamination of Progzess Payments and will be subject <br /> to approval by Owner. Any portioa of the mobilization item not fully verified will not be paid <br /> undl the 5nal payment of the projxt. � <br /> The Convactar will be paid for mobilization in accordance with the following bid item: � <br /> It�em Descrivtion Unit <br /> 2.4 Mobilizadon/Demobili7stion L.S. � <br /> TS-2-2 ' <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.