My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Irrigation well project manual-1992
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2865 North Shore Drive - 09-117-23-24-0001
>
Misc
>
Irrigation well project manual-1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:49:28 PM
Creation date
10/16/2017 3:04:24 PM
Metadata
Fields
Template:
x Address Old
House Number
2865
Street Name
North Shore
Street Type
Drive
Address
2865 North Shore Dr
Document Type
Misc
PIN
0911723240001
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� DMSION 2 <br /> ' MOBILIZATTON <br /> � 2.1 SCOPE OF W�RK <br /> The work covered by this section of these Specifications includes,but is not limited to�fumishing <br /> � all labar,equipment and materials and performing all operations necessary to move pexsonnel, <br /> equipment�supplies and incidentals W the project site and remove them from the site following <br /> completion of the w�c and performing all wak that must be completed and for which payment <br /> , is not eacplicidy provided elsewhere in these Specifications. The work cove�ed by this section <br /> includes famishing bonds and insurance required specifically for this P�l��:Providing submittals <br /> as spocifiod;obtaining all permits required for the performance of the work except as specifically <br /> � stated elsewhere in these Specificadons;and perfotming all wark to clean up the project site that <br /> is not outlinod elsewh�e in these Specifications. <br /> � 22 MATERIALS (POST AWARD SUBMITTALS) <br /> 2.2.1 Proiect Contacts <br /> 1 Within 5 days following Nodce to Proceed, the Contractor shall submit to the <br /> Ovme�s Representadve a list of the driller(s) and assistant(s) names who are to <br /> ' complete the project, including telephone numbers for 24 hour response should <br /> problems arise. <br /> , 22.2 Records,Well L.ojts and Drillin¢ Samoles <br /> ' The Contracta shall main�in logs of all relevant drilling and sampling data. <br /> Information contained in the Contracto�s logs shall include, but not be limited to: <br /> I 1. Well number, location,and date <br /> 2. Type of equipment used, <br /> 3. Reference point fa all depth measurements, <br /> ' 4. Final depth of hole, <br /> S. Sample number,sampling depths.descriptions and classifications, <br /> 6. Water levels, <br /> 1 7. Drilling conditions encountered. <br /> 8. Depth or location of any lost drilling fluid,drilling materials or tools, <br /> 9. Descripdon and dimensions of well installations,and <br /> ' 10. Record of well development and sediment removal,and <br /> 11. Test pumping records. • <br /> � Upon completion of the well,the Contractor shall furnish a copy of the field log to <br /> the Engineer. 'I1�e Contractor shall also furnish a leuer report w the Engineer <br /> ' describing the work completed. Final payment will not be made to the Contract� <br /> until the Enginee,r is furnished with field log and the Contracco�s report. <br /> , TS-2-1 <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.