My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-P07100 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2265 North Shore Drive - 10-117-23-33-0005
>
Permits/Inspections
>
2004-P07100 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:26:30 PM
Creation date
10/4/2017 2:30:41 PM
Metadata
Fields
Template:
x Address Old
House Number
2265
Street Name
North Shore
Street Type
Drive
Address
2265 North Shore Drive
Document Type
Permits/Inspections
PIN
1011723330005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. <br /> . s <br /> ❑ Closet 203: Remove existing floor finish, and plumbing fixtures. New melamine closet <br /> system. <br /> ❑ Existing Rooms D236, D237, D240 and D242: Remove Floor finishes, millwork, <br /> cabinets and plumbing fixtures. <br /> ❑ Closets D238, D239: Remove existing cabinets. <br /> ❑ Stair 222: Rebuild and restructure stair. <br /> ❑ Exercise Room 221: Restructure 3�d floor framing above with 2 new beams as required <br /> by engineer. Verify e�dsting structure for any additional work. 1 new window. Carpet <br /> floor. Panel three walls, one with mirrors. <br /> ❑ Bath 218: Lower plumbing at toilet to remove platform for new comfort height toilet. <br /> Switch hinge on mirror by window. <br /> ❑ Bedroom 210: Salvage wood floor and replace if necessary, otherwise patch. <br /> ❑ Den 212: Salvage crown at ceiling for additional material in Room 210. Patch floor at <br /> new doors. New sink and RO line. New stained cabinets/millwork per drawings. <br /> o Gregg's Bath 213: All new fixtures/fittings and finishes. Wood floor at sink area, tile at <br /> toilet/steam shower. <br /> ❑ Closet 215: Painted system per drawing. <br /> ❑ Master Bedroom216: Patch floor at new doors to Eadsting Closet 217. Reconfigure <br /> shelving per drawing. <br /> ❑ E�dsting Hall 219: Remove carpet refinish wood floor. Add new beam at removed wall <br /> if required. <br /> ❑ Baths/Showers 205/206. 207/208: All new locations for fixtures/fittings, showers. New <br /> finishes, painted millwork. All paneling to have small transition molding. <br /> v Laundrv 209: Laundry sorter, painted and solid surface countertop per drawings. <br /> ❑ THIRD FLOOR: Clean up and paint walls and ceilings, paint and patch millwork as <br /> required, paint floors eaccept, 303, 307 8. 312. Upgrade electrical and replace light <br /> switches as required. <br /> ❑ Stair Hall 301 Base Bid: Add one wall and door per drawing. Patch or replace wood <br /> floor as required. <br /> ❑ Existing Bedroom 307: Remove non bearing walis in Rooms 305-309, repair/patch and <br /> SSV wood floors, patch walis and ceiling, cleanup e�dsting walls and ceiling and paint. <br /> Remove existing light fixtures and add new surface mounted decorative fixtures. Add <br /> HVAC to these rooms. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.