My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-P07100 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
N
>
North Shore Drive
>
2265 North Shore Drive - 10-117-23-33-0005
>
Permits/Inspections
>
2004-P07100 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:26:30 PM
Creation date
10/4/2017 2:30:41 PM
Metadata
Fields
Template:
x Address Old
House Number
2265
Street Name
North Shore
Street Type
Drive
Address
2265 North Shore Drive
Document Type
Permits/Inspections
PIN
1011723330005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
View images
View plain text
� 1 <br /> K,y` <br /> i <br /> ! <br /> � <br /> ��� � � <br /> ► ~ e <br /> PROJECT SCOPE PHASE 1 ESTIMATE <br /> PROJECT: STEINHAFEL <br /> CC: A8.A, STEINHAFELS, BILL HARRISON <br /> DATE: MONDAY, DECEMBER 16, 2003 <br /> ❑ Project Phases: 1. House Second anci Third Floor, New Mechanical/Electrical services <br /> 2. House First Floor 3. New Garage 4. Caretaker's House/Tower 5. Boathouse 6. <br /> Landscape and Terrace. <br /> ❑ Mechanical/Electrical: New electrical service 600-800 amp with panel on west Garage <br /> wall. Existing 200 amp generator for Master Bedroom, Refrigerators/Freezers and <br /> minimal lighting. New HVAC systems; 2 furnaces at 3`d floor for 2"d floor A/C 8, heat. <br /> 2 furnaces in Basement for 15` floor P�/C 8.heat. <br /> ❑ Re-roofin�: Entire house except South/Lakeside Porch to be re-roofed with 16" #1 <br /> Blue Label red cedar shingles, 5" exposure on 1 S# felt and ice barrier per cocie, <br /> copper flashings. <br /> ❑ BASEMENT: E�cisting boiler to be removeci Asbestos to be removed. Remove <br /> unneeded plumbing. Existing column under main stair/pantry to be re-engineered ancl <br /> re-constructed for first floor sag. Remove stair from first floor to Basement near Front <br /> Entry. <br /> ❑ EXISTING MAIN STAIRS Rooms 107, 222: Remove stairs from first to third floors, <br /> salvage typical parts of existing stair for creating new millwork. <br /> o F[RST FLOOR: <br /> o Stair 107: Rebuild and restructure stair. Handrail, treads, and newel post caps to be <br /> stained, other millwork painted. New Closet at olcl stair down to Basement. <br /> ❑ SECOND FLOOR: Salvage all removed doors and hardware, verify suitability for <br /> relocation. All millwork painted except Den 212 stained. Paint all walis and ceilings. <br /> Verify condition of all windows for rot repair and refinishing. Drop ceilings 12" per <br /> ceiling plan for mechanical runs. <br /> S:\Projects\Steinhafel_DG\Correspondence\Scope Phasel Memo_ST.doc 12/1G/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).