Laserfiche WebLink
� �4 <br /> o F�dsting Mechanical 31 1: Remove tile floor finish, patch sub-floor, add painted wood <br /> floor. <br /> ❑ Alternate Bid: 1. Add new Bath and Closet for E�dsting Bedroom 310. Remove west <br /> wall of Fxisting Bedroom 304, repair/patch wood floors, patch walls and ceiling, <br /> cleanup existing walls and ceiling and paint. Remove e�dsting light fixtures and add <br /> new surface mounted decorative fi�ctures. Add HVAC to these rooms. <br /> 3 <br />