Laserfiche WebLink
4. Any used or existing equipment must meet the NSF standards, be listed, and be <br /> in "like new" condition (this will be verified by our department during construction <br /> and final inspections). <br /> P/umbing <br /> 5. Ensure that a licensed plumber installs all plumbing according to the Minnesota <br /> Plumbing Code. In addition, plumbing plans must be submitted to the Minnesota <br /> Department of Labor and Industry (Plumbing and Engineering Unit, 443 Lafayette <br /> Road North, St. Paul, MN 55155-4343) plumbing inspection program for review <br /> and approval prior to installation. <br /> Sinks <br /> 6. Ensure mop sinks are surrounded by 3 feet of tile, and wal� surfaces must be tile <br /> or fiber reinforced panel (FRP). <br /> 7. Ensure adequate space (12 inches) or a shield is provided between the <br /> preparation/hand sink and a preparation table to prevent contamination by <br /> splashing. The location of the hand sink, next to the 3-compartment sink in the , <br /> main floor kitchen space, is acceptable if there is a 12 inch gap or the hand sink <br /> is adjacent to the `dirty' side of the 3-compartment sink. <br /> 8. Ensure a sign directing employees to wash hands, hand cleanser, single-use <br /> towels, and a fingernail brush is provided at all hand wash sinks located in food <br /> service, food preparation, and ware washing areas. <br /> 9. Ensure the size of the 3-compartment sink is large enough to accommodate the <br /> largest utensil/equipment that is to be cleaned and sanitized. <br /> 10. Provide hooks or hang-up brackets at the utility sink for the storage of mops and <br /> brooms. <br /> 11. As submitted in your response letter, three stainless steel drying racks for <br /> the dish machine will be installed above the sinks in the kitchen. <br /> Storage <br /> 12. As submitted in your response letter, additional dry storage space will be <br /> provided in the supply room. This area will be finished with tile, FRP, and a <br /> cleanable ceiling surface. This dry storage area will be equipped with NSF <br /> shelving and the additional NSF freezer. <br /> 13. As submitted in your response letter, chemicals will be stored on shelving <br /> in the lower level mop room area. <br /> Installations <br /> 14. Ensure all annular openings around pipes and other conduits that pass through <br /> the walls or floor are sealed properly. <br />