Laserfiche WebLink
i Y <br /> � <br /> Cuetom Home�, Inc <br /> has submitted a report, which is on file with the City, that the filling on the Property has not impacted <br /> the septic sites. Soil verifications had previously been done and approved for the septic site areas, as of <br /> September 26, 2014. <br /> After laying out the house on the site, establishing the wetland buffer of 25' as required by the <br /> Minnehaha Creek Watershed District (both on-site and on the survey), and indicating the Septic Setback <br /> of 50', as required by the City, we are finding that, not only do we have minimal area for a primary site, <br /> but no adequate area for an alternate site. <br /> As described in the attached letter from Dale Denn, the septic designer, we have done a considerable <br /> amount of field and office analysis to arrive at the best solution for wastewater management. Not only <br /> has he increase the absorption field to a 5 bedroom design (the house is a 4 bedroom), but also increased <br /> the depth of the sand bed and added a timer to effectively regulate the water flow to the mound system. <br /> We find that the reasons listed above and in the attached letter from the septic designer constitute a <br /> hardship on this particular lot and ask that the Variance be granted. If there is anything else you require, <br /> please feel free to contact me. <br /> Sincerely, � <br /> ' �. <br /> Joe Mailhot <br /> Denali Custom Homes, Inc. <br /> 18352 Minnetonka Blvd. <br /> Deephaven, MN 55391 <br /> Cell: 763.452.8347 <br /> Email:joem@denalicustomhomes.com <br />