My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-16-1979 Council Minutes
Orono
>
City Council
>
1979
>
10-16-1979 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2015 12:41:35 PM
Creation date
4/22/2015 12:41:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RFGULAR rZEETIN� O�' mHE ORONO COUr1CIL, OCTnBFR 16 , 1979 Page 21 <br /> 2. �arage at the ���ater Plant BUD�ET EXPLANAmIONS <br /> At the present time, there is no vehicle or (Continued) <br /> inventory and su��ly storage at the Plavarre <br /> Water Plant. <br /> r4aintenance supnlies for day to da�� maintenance • <br /> are noia being stored in the Public �•�7orks <br /> buildings in Crystal Bay because there is no <br /> room for storage in the water plant, and items <br /> such as oil for lift station pump motors, <br /> distillates and other maintenance items cannot <br /> be stored in the water plant hecause of being <br /> health hazards. <br /> The utility department is a three-man department <br /> with three vehicles, two 3/4 ton pickup trucks <br /> and one high pressure sewer line cleaninc� <br /> rlachine. The two pickups carr�� all the <br /> maintenance tools in the back of the vehicle <br /> because of lack of storage elsewhere. ^'his <br /> becomes dif�icult in the winter �vhen it snows <br /> as the tools get covered �aith sno��, and wet <br /> in the summer when it rains. <br /> The high pressure sewer cleaning machine is <br /> a bigger vehicle being rated as a two-ton <br /> vehicle. The sewer cleaninq machine is a <br /> very sophisticated machine with several �umns <br /> and valves that riust be drained each time <br /> after its use in cold weather to elirlinate <br /> free2e up. mhe machine is presently beinc� <br /> kept in cold storaqe in the Puhlic Taorks <br /> buildings in Crystal Bay. <br /> At the present time, if a lift station �urtp, <br /> compressor, water meter, etc. , needed minor <br /> repair, it is brought down to the Public <br /> Works shop at Crvstal Bay. <br /> If a garage is constructed at the water nlant, <br /> it will increase the life of ec�uinment and <br /> tools and eliminate several trips to the <br /> Crystal Bay area and improve on the efficiency <br /> of the department and save on fuel. <br /> I have estimated the cost as follows: <br /> Concrete floor 26X26 51,500 - $2 , 000 <br /> P4aterial for building 53 ,000 - $3,500 <br /> Labor, heating, electrical $3 , 500 <br /> (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.