My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-23-1979 Council Minutes
Orono
>
City Council
>
Minutes
>
1970-1979
>
1979
>
01-23-1979 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2015 11:52:08 AM
Creation date
4/22/2015 11:52:05 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 15 <br /> McCOMBS-KNUTSON ASSOCIATES, INC. <br /> "'.����` � CONSULTING ENGINEERS ■ LAND SURVEYORS ■ SITE PLANNERS � <br /> .r�'-- <br /> Reply To: <br /> 12805 Olson Memorial Highway <br /> Minneapolis, Minnesota 55441 <br /> (612) 559-3700 <br /> January 17, 1979 <br /> Mr. Dick Benson <br /> City Administrator � <br /> City of Orono. <br /> P.o. Box 66 - <br /> Crystal Bay, Minnesota 55323 <br /> Subject: Medina Morningside Sewers <br /> Dear Mr. Benson: <br /> We met with the City Council of Long Lake regarding the <br /> construction of the proposed sewer bypass line through Long Lake. <br /> The bypass line will provide sewer capacity in the Long Lake sewer <br /> system for Medina Morningside and a portion of Orono. <br /> The City Council of Long Lake passed a Motion accepting the <br /> concept of the proposed construction based on the following <br /> provisions: <br /> 1 . Meters would be furnished to measure the sewage volume. . <br /> TF�e meters would be �located at the Medina Morningside <br /> Lift Station and where the Medina-Orono-Hackberry lines <br /> enter the Long Lake System. <br /> 2, The Long Lake Bypass Line would be increased from 8" to <br /> 10" and the Long Lake Industrial Park would be connected <br /> to the bypass line. This would save Long Lake pumping costs <br /> because presently this area goes through the Lift Station <br /> . at Symes Avenue. Whereas, the bypass line is a gravity <br /> system. This would also reduce the flow in the May Street <br /> sewer which has experienced flooding problems in the past. <br /> j. The flow from Orono and Medina into the Long Lake System <br /> ' wouad be limited to a flow which would be specified prior to <br /> construction. The flow limitation would be based on the <br /> surplus capacity in the Long Lake line. <br /> :.; . . <br /> Minneapolis - Hutchinson - Alexandria - Granite Falls <br /> printed on recycled paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.