Laserfiche WebLink
M�. Dick Benson <br /> January 17, 1979 Page 16 <br /> Page Two <br /> 4. The 25 homes ln the Hackberry Area would remain connected to <br /> the Long Lake system. <br /> 5. Long Lake would not have to pay any of the cost of the Long <br /> Lake Bypass line, and, that Orono and Medina would maintain <br /> the line. <br /> I will get you a copy of the actual Motion as soon as it is <br /> available. <br /> The City Council of Medina has discussed Long Lake's Proposal and <br /> have no problems with it. However, they do feel that Orono should pick <br /> up the difference in cost between the 8" and 10" line which is estimated <br /> at $5,000. <br /> Long Lake feels that by connecting Long Lake's Industrial Park to <br /> the bypass line, additional capacity 1s provided in the May Street <br /> tine thus providing capacity in the Long Lake sewers for tfie Hackberry <br /> Area which drains through this line. <br /> TF�e.City Council of Medina has schedule a Public Hearing for <br /> the property owners in Medina Morningside for February 19. We would <br /> appreciate Orono's comments on Long Lake's Proposal as soon as possible <br /> so that we can provide accurate cost estimates to the property owners <br /> in Medina-Morningside at this Hearing. ' <br /> If you have any questions, please contact us. <br /> � Very truly yours, � <br /> McCOMBS-KNUTSON ASSOCIATES, INC. <br /> � <br /> Lyle Swanson, P.E. <br /> Medina City Engineer <br /> LS:j 1 <br />