Laserfiche WebLink
, • <br /> �il)T�f1!� T'�:�t 1 i'�';� ri7� �it�.l�TJ� CC�ti��'C 1 T� i:�� T l G `� D <br /> �' _ O� � . --=:Ch 16 , 7� age F� <br /> Present shoulder surfacing by the county provides BIKE/HIKE TRAILS <br /> adequate width to accommodate bike traffic on those (Continued) <br /> wo segments. `I'rail continuity is provi�ed west <br /> into Spring Park and south into Tonka Bay. Bike , <br /> route signs will be installed bef�re spring. <br /> None of the remaining route segrlents provide <br /> sufficient surfaced shoulder width to meet <br /> criter_ia 1 above. A 5 or 6 foot wide shoulder <br /> is deened necessary. Plor are separate bike routes <br /> rernote from the roadway available. Consequently, <br /> bike route signing could be r�isleading to both <br /> the cyclist and motorist using these rou'ces <br /> resulting in a potentially hazardous situation. <br /> However, even though not signed as bike routes, <br /> these roads are, of course, open for bike travel <br /> subject to rules of the road. <br /> In sur.unary, priority #1, CSAH 15 from Spring Park • . <br /> to CSAH 15, and priority #3 CSAH 19 from the <br /> Narrows Bridge to CSAH 15 will be signed as bike <br /> routes. ihe remainder of the routes cannot be <br /> signed at this time due to insufficient bike <br /> facilities. <br /> Should you care to discuss this fu.rther or need <br /> more inforr.►ation, please give me a call. " <br /> Dennis L. Hansen, P.E. <br /> End of letter <br /> Butler moved, Massengale seconded, to accept the <br /> letter fror,i the Departrient of Transportation <br /> concerning bike/hike routes on County roads. <br /> Motion, Ayes {4) - Nays (0) . <br /> Dick Benson, City Administrator, presented the SALARY INCREASE <br /> City Council with an employment evaluation of Tom Jacobs <br /> Tom Jacobs, Building Inspector, from Hank Muhich, <br /> Zoning Ad.ministrator, dated March 8, 1978, which <br /> states: <br /> On 2day 31, 1977, Tom Jacobs joined the City staff <br /> as the field inspector on building and plur,ibing <br /> projects for which we issued permits . He �:as <br /> also responsible for inspections in Long Lake <br /> and P�innetonka Beach. Since he has been with <br /> us, we have also begun issuing permits for <br /> mechanical inspections which have added to his <br /> work load. Although we no longer provide this <br /> service for Long Lake , we have contracted to <br /> provide this sar,te service for the City of r4edina. (Continued) <br />