My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-23-1978 Council Minutes
Orono
>
City Council
>
1978
>
01-23-1978 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 3:23:26 PM
Creation date
4/21/2015 3:23:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OF THE ORONO COUNCIL, JAi1UARY 23, 1978 Page 34 <br /> TArIAGER �K i 1�rF <br /> (Continued) <br /> Re: Tanager Bridge No. 27529 <br /> floating material or other material resulting from construction <br /> that does enter channel will be promptly removed. <br /> Section S-21 Turf Establishmen� paragraphs S-21.1 through S-21.4 <br /> Provides for placement of and for maintenance of sod over areas <br /> disturbed by construction. <br /> Section S-24 Work by Others, paragraph 5-24.1 <br /> Adyises bidders of pending Orono-Long Lake Interceptor within the <br /> project area of the bridge and states that " - - - - - sewer contract <br /> will require work to commence on May 15, 1978 with completioc� within <br /> the construction limits of this project (No. 7252) or or befo're <br /> July 15, 1978.'r _ <br /> Section S-26 Maintenance of Traffic, paragraphs S-26.1 and S-26.2 <br /> Provides that all vehicular traffic shall be excluded from Co. <br /> Rd. 15 within the project limits and further provides for the con- <br /> tinuation of and for the protection of boat traffic in the channel. <br /> Section S-27 Time Schedule, paragraphs S-27.1, S-27.2 and S-27.3 <br /> Provides that construction shall be started on or before May 15, <br /> 1978, that roadway cannot be disturbed prior to April 17, 1978 <br /> and all work, except maintenance, sod and cleanup shall be com- <br /> pleted within 45 working days. <br /> Section SB-4 Remove Old Brid�e <br /> Provides for channel cleanout and for shaping and dressing new <br /> slopes between abutments as indicated on plans. Also provides for <br /> removal of old structure and piles dowa to elevation 920.5. <br /> The Construction Cooperative Agreement, agreement No. PW 32-08-77, between the <br /> City of Orono and the County of'Hennepin, requires that the City pay for 507, of <br /> the curb and gutter, retaining walls and drainage items, plus a percentage of <br /> construction costs for engineering design and construction. These items are <br /> estimated as follows by Hennepin County: <br /> Concrete curb and gutter - Des. B624 $ 187.50 <br /> Retaining Walls 17,359.61 <br /> Drainage Items 476.50 <br /> Total Estimated Construction $18,023.61 <br /> -}-Right-of-way Costs 250.00 <br /> Sub-total $18,273.61 <br /> -}-20% Design & Construction 3,604.72 <br /> Total Estimated Orono Share .. . . . . . . . . . . . . $21,878.33 <br /> During this review, no attempt has been made to judge the structural design and <br /> technical aspects of the project and they are presumed to be adequate. Relative <br /> to those aspects of the specifications which have a direct impact on the City o£ <br /> Orono, we offer the following comments and recommendations: <br /> (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.