My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-23-1978 Council Minutes
Orono
>
City Council
>
1978
>
01-23-1978 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2015 3:23:26 PM
Creation date
4/21/2015 3:23:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
R�GULAR PIEETIPJG OF THE OROi]O COUPJCIL, JANUARY 23, 1978 Page 35 <br /> TANACER BRIDGE <br /> (Continued) <br /> Re: Tanager Bridge No. 27529 <br /> l. It is recommended that the specifications be classified to require the <br /> prompt removal of any debris or floating material that may inadvertently <br /> enter the channel or water areas as a result of the construction activ- <br /> �ty. <br /> 2. The scheduling and timing of the pending construction of the Orono-Long <br /> Lake Interceptor should be clarified and resolved. <br /> 3. The Orono-Long Lake Interceptor, the Co. Rd. 15, Tanager Bridge and the <br /> Co. Rd. 51, Noerenberg Bridge will all require detour routes. The total <br /> detour system should be reviewed to ensure a compatible system within <br /> the City of Orono. <br /> 4. Subject to the above comments, and subject to the approval of the City <br /> Attorney as to form and execution, we recommend that the plans and <br /> specifications for Hennepin County Project No. 7252 and the Construction <br /> Cooperative Agreement No. FW 32-08-77 be approved by the City of Orono <br /> and that the Mayor, the Clerk and the Engineer be authorized to sign the <br /> necessary documents and plans where appropriate. <br /> We are returning under separate cover all of the items submitted to us by your <br /> office. <br /> End of letter <br /> P4ayor Van Nest rloved, Pesek seconded, to forward <br /> the above letter to Hennepin County for their <br /> review and comments. tsotion, Ayes (3) - Nays (0) . <br /> t�r. Jim Olson, City Engineer, reviewed with the TANAGER LAKE CHANNEL - <br /> City Council his letter dated January 20, 1978 INTERCEPTOR <br /> which states: <br /> Re: DNR Water Permit Application Review <br /> Orono-Long Lake Interceptor <br /> Our File No. 139 <br /> We have reviewed the permit application from the Metro Waste Control Commission <br /> to the Dept. of Natural Resources for the Orono-Long Lake force main crossing of <br /> the channel between Tanager Lake and Browns Bay, A copy of plan sheet 7B show- <br /> ing the location and a copy of plan sheets 16B and 17B indicating several details, <br /> together with six photographs of the crossing area w ere included with the appli- <br /> cation. <br /> There were no project specifications with the application, so we cannot dete nnine <br /> the extent and type of restoration that is anticipated for the area. The areas <br /> of concern for the City of Orono include the following: <br /> (Continued) <br />
The URL can be used to link to this page
Your browser does not support the video tag.