Laserfiche WebLink
� <br /> • REGULAR DZEETING OF THE ORONO COUNCIL, JUNE 27, 1977 Page 19 <br /> � Mr. Greg Frank, City Engineer, stated that the FLOOD IPJSUR.ANCE STUDY <br /> following letter was received from Gler.� C. <br /> � ���oodard, Jr. , Acting Regional Director, concerning <br /> the Flood Insurance Study, dated June 14 , 1977: <br /> � <br /> a Attached are final draft copies of the Flood Insurance <br /> Study for your community. You will be contacted <br /> � by this office within thirty (30) days in order <br /> that we may establish a meeting date for a review <br /> + and presentation of the report. In the meantime, <br /> please review the report to assure yourself and <br /> � other local officials of its technical sufficiency. <br /> Should you discover additional technical data which <br /> � should be considered as a part of the study, please <br /> � make this known to us at our review meeting. <br /> � If you have any questions concerning the study, <br /> please contact either Mr. Larry Bailey or me at <br /> � (312) 353-0757. <br /> � EI1C� of letter. ` <br /> � <br /> � Mr. Greg Frank, City Engineer, stated that the COUNTY ROADS #19 & #84 <br /> following letter was received from Dennis L. <br /> � Hansen, County Traffic Engineer, concerning <br /> County Roads #�19 & #84 , dated June 22 , 1977; <br /> �Enclosed for your information is a set of plans <br /> � for the above mentioned improvement. A set of <br /> � plans was previously sent to the City of Orono <br /> on May 19 , 1977, along with a cover letter <br /> ` briefly describing the project. <br /> � This channelization project is designed to eliminate <br /> the immediate problem of conflicting traffic move- <br /> • ments through the intersection. Existing conditions <br /> • provide confusion and serious accident potential <br /> between the eastbound CSAH 19 to CSAH 84 movement <br /> • and the northbound CSAH 19 movement. The channelization <br /> will also provide separation of CSAH 19 traffic through <br /> � the intersection. <br /> � The project will be constructed at Hennepin County <br /> expense by our maintenance forces. The estimated <br /> � cost of this improvenent of $1,500 with construction <br /> � taking approximately three days to complete. <br /> � ��ork within the City limits of Orono involves <br /> construction of approximately 100 ' of 6-foot wide <br /> � bituminous shoulder located in the northeast c�uadrant <br /> of the intersection. As seen by the cost and extent <br /> � of the work involved, this improvement is not a major <br /> Areconstruction project but a spot safety improvement <br /> project intended to provide the travelling public <br /> ` a safer and more clearly defined intersection. <br /> � �nd of letter (Continued) <br /> � <br />