Laserfiche WebLink
� <br /> OROi30 COUNCIL MEETITIG HELD FEBRUARY 28, 1977 Page 25 <br /> � <br /> . We are taking this opportunity to request your VO-TECH SCHOOLS <br /> consideration of the Joint Independent School (Continued) <br /> � District i1o. 287 need for sewer service to its <br /> proposed West Site Campus located immediately <br /> north of County Road No. 6 in Medina. <br /> � As you know, our West Site Campus property is <br /> . 171 acres in size (with 23 proposed additional <br /> acres) being four quarter sections and a 10 acre <br /> � parcel bordered partially on the west by Homestead <br /> Trail and on the east by the Medina-Morningside <br /> � residential development. We propose to develop <br /> a complete area vocational-technical school <br /> � complex consisting primarily of a main building <br /> eight acres in size with a student capacity of <br /> 2, 400 high school, post-secondary and adult <br /> + education students on a multi shifted basis. <br /> Our current development schedule is tentative <br /> because we are not able to program the various <br /> � governmental authorizations which must be obtained. <br /> However, we hope to commence campus construction <br /> ' activities in 1978 with the detail design phase <br /> of the project. This would mean sewer service <br /> facilities will be needed by the year 1980. <br /> Mayor Van Nest continued that our Resolution #737 <br /> expressed Orono' s conern so that the staff at <br /> Vo-Tech could address itself to these specifics. <br /> There is nothing premature when conter:�plating <br /> long range planning. Orono has not had any <br /> communication from Vo-Tech from 1970 to 1976. <br /> � John Lobben stated that traffic, sight feasibility, <br /> � environmental assessments, an�3 storra water runoff <br /> are being studieci. <br /> � <br /> Mayor Van Nest commented that Orono wants input <br /> and does want to be included in all studies. An <br /> urban facility in a rural area is of major concern. <br /> Mr. Lobben presented copies of Analysis of Environmental <br /> Concerns, Traffic Studies, Site Analysis and a <br /> t, summary letter fx'om the environmental consultants <br /> for Orono review. <br /> Dick Benson, City Administrator, presented to the COr�IPUTER PROGRAMS <br /> City Council a status report on computer programs. <br /> � I. General Operations <br /> As of January 1, 1976, the City of Orono had <br /> the following services performed by the Maple <br /> + Plain Company at a monthly cost of $375.00: <br /> � (Continued) <br />