Laserfiche WebLink
� <br /> � ORONO COUNCIL MEETING HELD OCTOBER 27, 1975 Page 5 <br /> r g) Clear case of spot rezoning and a diminution REZONING <br /> yof value to surrounding properties which have Cheyenne Land Company <br /> complied with our current zoning requirements. (Continued) <br /> � h) This property could be developed into 14 or <br /> • 15 residential sites which could be used for the <br /> permitted and conditional uses for the district. <br /> • i) On several occasions, the State Highway <br /> Department has indicated that the new Highway <br /> r �r12 will be extended through this property. The <br /> . plat submitted indicates no recognition of this <br /> matter. <br /> � j) Future highway construction through this <br /> � property would disrupt all residents of these <br /> properties at that time. <br /> r k) Considerable oppositivn from area property <br /> � owners at the Public �:earing. <br /> 1) The refusal to erect a sign about rezoning <br /> • as requested by the Planning Commission. <br /> � m) The Comprehensive Plan and Zoning Code states <br /> that this area should be zoned two acre residential, <br /> � n) Transportation system is not adequate. <br /> � o) Although it has been suggested by the Client°s <br /> � attorney that annexation to Long Lake may be <br /> considered, all the problems would still exist. <br /> � p) The previous misstatements by the applicant <br /> � that the Village Engineer reviewed the plat and <br /> found it in compliance with City Ordinances. It <br /> � is obvious one acre sites have been designated <br /> in a two acre district. <br /> • <br /> i�emo - October 3, 1975 - Henry P�luhich <br /> � This is a sum:nerization of the Cheyenne Land <br /> � Company file and Skip P�tcCombs recent report <br /> regarding the wetlands as they exist in relation <br /> � to the areas shown on the wetlands mapse Wetlands <br /> i areas should be determined for buildable area. <br /> � The proposal here is for rezoning from two acre <br /> to one acre residential zone which conflicts with <br /> � the Village°s determination to zone this area two <br /> acr�, This decision was reached after extensive <br /> � research and review by the Council, Planning <br /> Commission and staff. Through past experience, <br /> � we have found one acre sites to be inadequate to <br /> � support an on-site sewage disposal systemo i�e <br /> must adopt standards and regulations to protect <br /> � the health of the public, <br /> �he :'eveloper feels quite certain that the instal- <br /> lation of the Orono-Long Lake Sewer Interceptor <br /> � will be started in 1975o In talking with Mr. Bloom <br /> and Mr, Forester of the Metro talaste Commission, I <br /> � learned there could be further delay through <br /> � step reviews }�efore granting of bids. (Continued) <br />