My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
septic design-2001
Orono
>
Property Files
>
Street Address
>
K
>
Kokesh Farm Road
>
515 Kokesh Farm Road - 31-118-23-14-0009
>
Septic
>
septic design-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:29:27 PM
Creation date
4/12/2017 3:05:31 PM
Metadata
Fields
Template:
x Address Old
House Number
515
Street Name
Kokesh Farm
Street Type
Road
Address
515 Kokesh Farm Road
Document Type
Septic
PIN
3111823140009
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED SITE EVALUATION REPORT for Lot 1,Block 1,Kokesh Farm <br /> Sewage Treatment System Page 4 <br /> Sandy loam soil shall be placed on the filter material to a depth of 12 inches in the center of the mound and <br /> to a depth of 6 inches at the sides. <br /> S'vc inches of topsoil shall be placed on the fill material over the entire area of the mound. A grass cover <br /> shall be established over the ernire area of the mound. No shrubs sha.11 be planted on the top of the mound. <br /> Shrubs may be placed at the foot and side slopes of the mound. <br /> The side slopes of the mound will be 4 feet horizontal to 1 foot vertical(4:1). This gentle slope will allow <br /> easy mowing of the grass cover. The soil material at the toe of the dike should be slightly less permea.ble <br /> or somewhat tigtrter than the natural soil below the mound. This can be accomplished by selecting a finer <br /> soil or by compaction. <br /> Whenever mounds are locaxed on slopes, a diversion sha11 be constructed immediately up slope from the <br /> mound to intercept and divert runoff. <br /> �IJMP AND COLLECTION TANK: <br /> A pump shall be used to deliver ei�luent to the mound. The pump sha11 be cast iron or bronze fitted with <br /> stainless steel screws or constructed of other sound, durable and corrosion resistant materials. <br /> The pump installed will need to deliver 66.6 gallons per minute with a head of at least 14 feet. An alarm <br /> device shall be installed to warn of pump failure. Install the pump control and a Meyers, Model D.L.V. <br /> Audio Visual, Lo-Voltage alarm system or approved equal in a conspicuous place at the direction of the <br /> owner. <br /> Dosing Volume=25% of 750 g.p.d. = 188 gallons. <br /> DRAINFIELD ROCK REOUIRED: <br /> Based on 12 inches of rock, 27.8 cubic yards of rock would be required. <br /> SAND REOiJIltED: <br /> Approximately 298 cubic yazds of clean sand for under mound is needed. <br /> NOTES: <br /> A. Please see site plan layout. <br /> B. Typical sections for construction follow. <br /> C-7 �-3 E-4 E-6 E-12 F-7 <br /> PROPQSED$LEVATIONS: <br /> Top Fc�ndation = 1025.0 <br /> Basement Floor = 1017.0 <br /> Top of l�`Septic Tank = 1014.5 <br /> Top of 2� Septic Tank = 1014.0 <br /> Top of Pump Tank = 1013.5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.