Laserfiche WebLink
REVISED SITE EVALUATION REPORT for Lot 1,Block 1, Kokesh Farm <br /> Sewage Treatment System P e 3 <br /> Disking may be used for surface prepazation as a substitute for mold board plowing in soils having <br /> percolation rates faster than 15 minutes per inch(sandy loam)in the top 8 inch depth. <br /> Back hce teeth ma.y be used to roughen the soil surface and break up the sod layer. Care must be taken so <br /> as not to compact or puddle deeper soil la.yers. In no case shall any surface soil be excavated and removed <br /> from the area. <br /> Mound Construction shall proceed immediately af}er surface preparation is completed. Every effort should <br /> be taken to prevent ra.in from falling on the prepared soil surface. <br /> CONSTRUCTION NiA'TRRTAi.4 A1Vn PROCED TRF�; DISTRT�LTTTnN OF�FFi�LTFNT• <br /> A minimum of 12 inches of soil defined as sand shall be placed where the filter material is to be located. <br /> A crawler tractor with a blade or bucket shall be used to move the sand into place. At least 6 inches of sa.nd <br /> shall be kept under the tracks to mmumze compacting of the plowed layer. The sand layer upon which the <br /> filter material is placed sha11 l�level. <br /> Sand is defined as a soil texture composed by weight of a least 25 percent of very coaxse and medium sand, <br /> varying in size from 2.0 to 0.25 mm, less than 50 percent of fine or very fine sand ranging in size between <br /> 0.25 and 0.05 mm, and no more that 10 percent of particles smaller that 0.05 mm. <br /> A minimum depth of 9 inches of filter material (rock) sha11 be placed on the sand layer prior to installing <br /> the distribution pipe. <br /> Filter material is defined as clean rock, crushed igneous rock or similar insoluble, durable and decay- <br /> resistant material free from dust,sand, silt or clay. The size shall range from 3/4 inch diameter to 2 'h inch <br /> diameter. <br /> PRESSURE DISTRIBiTTION: <br /> Ei�luent sha11 be distributed over the filter material by three 1 1/2 inch diameter perforated pipes under <br /> pressure 72.5 feet long. Perforation holes shall be 1/4 inch diameter drilled in a straight line along the length <br /> ofthe pipe. Hole spacing shall be 30 inches with 30 perforation per lateral. Holes shall be drilled straight <br /> into the pipe and not at an angle. A sharp drill shall be used and any buns in the inside of the pipe shall be <br /> removed. The perforated pipe laterals shall be installed level with the perforations downward. <br /> The perforated pipe laterals shall be connected to a 2 inch diameter rnanifold pipe and sha11 have their ends <br /> capped. The laterals sha11 be spaced 40 inches on center and at 20 inches from the edge of the filter <br /> material. <br />�'he manifold pipe sha11 be connected to the supply pipe from the pump. The manifold shall be sloped <br /> toward the supply pipe from the pipe. <br /> Geo-Te�rtile material shall be placed over the filter material. <br /> Construction vehicles shall not be allowed on the filter material until backfill is placed. <br />