Laserfiche WebLink
Page 1 of 1 <br /> sRauN <br /> INTERTEC <br /> Special Inspection Daily Report <br /> Clty Of OfOno Page: 1 of 1 <br /> Report No.: #32 Dafe: December 4,2014 <br /> Projed Name: Orono Police Dept.Expansion Pro)ect No.: 614-05902 <br /> Project Address: 2730 Keliy Pkwy. Braun Intertec PM: MARK FLYNN <br /> Client City of Orono Client Project No.: <br /> Weather: Parfly Cloudy Temperature: 20°F <br /> Type of Inspection: Inspection Coverage: <br /> ❑ Continuous �Masonry � Rebar Placement ❑ Foundations ❑Special Cases <br /> � Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing <br /> ❑ Piles 8�Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer authorize changes to approved plans� Yes❑ (Listed Below) No � <br /> Descdption and locafion of work compiefed: <br /> -Observed the placement of rebar and grout for masonry wall @ Grid C.6 to D from 5.4 to 6 at elevation 104'and <br /> masonry wall�Grid A-5.7 to 8-5.7 at elevation 104'. <br /> lisf tests perfortned: <br /> I <br /> • Are there any discrepancies noted from this day's observations� Yes ❑ No � <br /> . Are there any outstanding discrepancies on this project8 Yes ❑ No � <br /> . If yes,see attached Summary Sheet. <br /> • Reporf Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emalled to: <br /> Jack Broncryk-jqck.brnnczyk@krausanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with the approved plans,spec'rfications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> a� Loosbrock, Tom <br /> I.D.No.: 1136593 <br /> -Prouiding engineering and enuironmenta(solu�ions since 1957 <br />