Laserfiche WebLink
Page 1 of 1 <br /> sRauN <br /> I NTE RTEC <br /> Special Inspection Daily Report <br /> City of Orono Page: 1 of 1 <br /> Rsporf No.: #31 Date: October 17,2014 <br /> ProJect Name: Orono Police Dept.Expansion Project No.: 614-05902 <br /> Project Address: 2730 Kelly Pkwy. Braun Intertec PM: MARK FLYNN <br /> Client City of Orono CIIsM Project No.: <br /> Waath�r: Partly Cloudy Temperature: 50°F <br /> Type of Inspection: Inspedion Coverage: <br /> ❑Continuous �Masonry � Rebar Placement ❑ Foundations ❑Speciai Cases <br /> � Periodic ❑Welding&Bolting ❑Concrete ❑ Fireproofing <br /> ❑ Piles 8,Piers ❑Tendon Placement ❑Soils <br /> Did the architect or engineer authorize changes to approved plansZ Yes❑ (Listed Below) No � <br /> DescripHon and Iocallon of work compleled: <br /> -Observed the placement of rebar and grout for masonry wall @ Grid D-5.2 to D-6 at elevation 108'. <br /> -Picked up 1 set of 5 cylfnders cast on 10-16-14. <br /> ,I <br /> list tasts porformed: <br /> • Are there any discrepancies noted from this days observations� Yes ❑ No ($! <br /> • Are there any outstanding discrepqncies on this project� Yes ❑ No � <br /> . If yes,see attached Summary Sheet. <br /> • Report Discussed with and Given to Contractor: Yes � No ❑ <br /> Report Emailed to: <br /> Jnr.k Rronczyk jack.bronczyk�krausanderson.com <br /> To the best of our knowledge,work inspected was done in accordance with ihe approved plans,specifications and <br /> applicable workmanship provisions of the current IBC,except as noted above. <br /> ���,�.,,�/� Loosbrock, Tom 1136593 <br /> ,.��v"' I.D.No.: <br /> I <br /> Prouiding engineering and environmental solutions since 195'7 <br />